Laserfiche WebLink
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br />26. NAMES OF KEY <br />PERSONNEL <br />(From Section E, Block 12) <br />27. ROLE IN THIS28. <br />CONTRACT <br />(From Section E, Block 13) <br />EXAMPLE PROJECTS LISTED IN SECTION F <br />(Fill in "Example Projects Key" section below before completing table. <br />Place"X" under project key numberforparticipation insame orsimilarrole.) <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />Marcus Unterweger <br />Principal Engineer <br />X <br />X <br />X <br />X <br />X <br />5 <br />X <br />10 <br />Ricardo Madriz <br />Senior Engineer <br />X <br />X <br />X <br />29. EXAMPLE PROJECTS KEY <br />NO. <br />TITLE OF EXAMPLE PROJECT FROM SECTION F <br />NO. <br />TITLE OF EXAMPLE PROJECT FROM SECTION F <br />1 <br />Aventura Seawall Assessment <br />6 <br />South FL. Management District -Maintenance Building <br />2 <br />Norwood-Oeffler Water Treatment Plant <br />7 <br />Hillsboro Canal WM Crossing <br />3 <br />North Dixie Highway Streetscaping <br />8 <br />4 <br />BC Light Poles Installation <br />9 <br />5 <br />FLL International Airport, Terminal 2 <br />10 <br />STANDARD FORM 330 (REV. 3/2013) P�ff 4 <br />