My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:25:21 AM
Creation date
9/6/2018 11:16:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Landscape Architect a. TOTAL b. WITH CURRENT FIRM <br />James Santiago <br />15, FIRM NAME AND LOCATION (City and State) <br />38 1 38 <br />16. EDUCATION WEGREEAND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Bachelor of Landscape Architecture, Louisiana Registered Landscape Architect, FL <br />State University, 1978 <br />Bachelor of Architecture, University of <br />Kentucky, 1975 <br />B.A. Speech and Theater Arts,Georgetown College <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Registered Mangrove Specialist <br />19. RELEVANT PROJECTS <br />STANDARD FORM 330 (6)2004) PAGE 2 <br />161 <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Zoo Miami Florida Exhibit Miami Florida <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />2017 <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />a. <br />An aproximately 1.4 million dollar project over a three year period. It entailed the <br />relocation and redesign of 22 acres including the new Florida Exhibit and Main entrance <br />experience. The scope included tree relocation and mitigation as well as the landscape <br />and irrigation designs. Now completed it has been a success. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Miami Gardens Municipal Complex Miami Gardens, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION(/fapp/icab/e) <br />2014 <br />2016 <br />b. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE HCheck if project performed with current firm <br />A platinum LEEDS project creating a completely new complex. Included the main City Hall <br />and Police complex. The project scope was the site plan for the exterior circulation, <br />the landscape and irrigation design. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Amelia Earhart Park, Phase I Miami Gardens, FL <br />PROFESSIONAL SER VICES <br />CONSTRUCTION(/fapplicab/e) <br />Miami Gardens, Florida, USA <br />2016 <br />2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 2 1 Check if project performed with current firm <br />C. <br />This is an existing 100 -acre park in Miami Gardens, Florida. Approximately 500 of the <br />park had been previously developed and our task was to program the future development of <br />the park and develop a budget for these future phases. It was decided that a water park <br />would also be added to the program for immediate construction. We developed plans for th <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />174th Street Sunny Isles, Fl. Sunny Isles, FL. <br />PROFESSIONAL SERVICES <br />1CONSTRUCTION (If applicable) <br />2015 <br />2017 <br />d. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE IX I Check if project performed with current firm <br />The project consisted of the expansion of an existing roadway. Our firm was tasked with <br />the permitting and construction documents for the landscape and irrigation systems for <br />the 1.25 miles of roadway. Our concerns were the coordiination between the City , the <br />local residents and the construction team. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Cleveland Clinic Nuerclogical Weston, FL. <br />PROFESSIONAL SERVICES <br />(If applicable) <br />Center Weston, Florida, USA <br />2016 <br />�CONSTRUCTION <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />e. <br />This campus located in Weston, Florida a 150 -bed facility on a 40 -acre campus. We have <br />been instrumental in the ongoing expansion for the campus since it was created. Recently <br />we were working to reconfigure all existing parking and add the nuclear medicine bldg. <br />facilities. <br />STANDARD FORM 330 (6)2004) PAGE 2 <br />161 <br />
The URL can be used to link to this page
Your browser does not support the video tag.