Laserfiche WebLink
ZC Ardaman & Associates, Inc. <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br />NUMBER <br />QUALIFICATIONS FOR THIS CONTRACT <br />10 <br />(Present as many projects as requested by the agency, or 10 projects, if not spec'rfied. Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State) 22. YEARS EXPEREINCE <br />Port of Palm Beach — Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (Yapplicable) <br />Riviera Beach, FL 2006-2016 <br />23. PROJECT OWNER'S INFORMATION <br />A. PROJECT OWNER B. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER <br />Port of Palm Beach Thomas Lundeen, PE (561) 383-4133 <br />(561) 881-0367 (f) <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope size, and cost) <br />Ardaman has provided Geotechnical Engineering and Testing services to the <br />Port of Palm Beach since the 1980's, including for the Cruise Terminal, the <br />expansion of Pier #2, the seawalls next to Slip #2, and other projects. In 2006, <br />Ardaman was awarded with an environmental/testing services contract for the <br />Port of Palm Beach District. Work performed to date has included Asbestos <br />Abatement Monitoring for the demolition of the Port Executive Plaza and <br />other buildings at the port and other projects dealing with groundwater <br />contamination. Currently, Ardaman is performing a semi-annual storm water <br />monitoring program satisfying the requirements of the U.S. Environmental <br />Protection Agency's (EPA) National Pollutant Discharge Elimination System <br />(NPDES) storm water permit. We are called on to collect sediment samples at depth in the Port's slips for <br />environmental and geotechnical testing to satisfy the Corps and FDEP <br />permits before maintenance dredging is conducted. Collection of <br />sediment samples has been completed either by placing our drill rig on a <br />barge or by divers. We also completed the environmental assessment <br />on the area in the vicinity of Slip 3 for the expansion of that slip. <br />Ardaman remains on-call to the Port of Palm Beach for any <br />environmental issues that may arise. <br />Ardaman also provides materials testing services on the Port's projects <br />including concrete and soil testing, and verification the rip -rap at the <br />Port satisfied the SFWMD requirements for this material. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 (6/2004) <br />181 <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />a. <br />Ardaman & Associates, Inc. <br />West Palm Beach, Florida <br />Prime Consultant <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />b. <br />STANDARD FORM 330 (6/2004) <br />181 <br />