My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:25:21 AM
Creation date
9/6/2018 11:16:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Standard of service <br />v Storm Secure Plan encourages underground conversion <br />Over 37% of FPL facilities are currently underground vs. 20% <br />nationwide <br />JHv♦ <br />More resilient to wind and weather <br />Even hardened above -ground systems are prone to damage <br />from windblown vegetation and flying debris <br />Less frequent outages during wind ever - <br />Difference of I% for normal weather, but minimum 20% <br />difference for major storms <br />Reduced outages means lighting is maintained for safety <br />Aesthefies 1 C:orrai`nunity Enhance en'i <br />270 <br />
The URL can be used to link to this page
Your browser does not support the video tag.