My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:25:21 AM
Creation date
9/6/2018 11:16:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9P] <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (YApplicab/e) <br />Avenue L, M, N, & 4th Gravity Sanitary, Force Main <br />Sewer & Lift Station Improvements <br />2015 2016 <br />d <br />Moore Haven, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Director/Manager: Construction of duplex submersible lift station with an 8 - <br />foot diameter wet well and approximately 350 linear feet of 6 -inch force main along <br />with 6,344 linear feet of associated 8 -inch and 10 -inch gravity sewer line. Services <br />included survey, design, permitting, preparation of construction plans and contract <br />documents, bidding and construction management. Project cost $1,286,627 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (YApplicable) <br />Miccosukee Tribe of Florida Water Distribution <br />System <br />2007 2013 <br />e <br />Miami, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Director/Manager: Survey, design, permitting, contract development, bidding <br />services, construction oversight for installation of 15,000 feet of 12" water main <br />including a 1 MG ground storage tank and pump system. Project cost $2.3 Million <br />1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Ranch Lakes Estates Gravity Sewer Installation PROFESSIONAL SERVICES CONSTRUCTION (lfApplicable) <br />Moore Haven, Florida 2011 2012 <br />f <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Director/Manager: Removal of existing home owner septic tanks and <br />replacement with a gravity sanitary sewer system and wastewater lift station. <br />Services included survey, design, permitting, preparation of construction plans and <br />contract documents, bidding and construction management. Project cost $483,823 <br />1)TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfApplicable) <br />Moore Haven Phase I Sewer System <br />Moore Haven, Florida <br />2000 <br />2003 <br />9 ;i <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Director/Manager: Construction of a 90,000 GPD wastewater treatment plant, <br />2 master pump stations, spray irrigation system, approximately 2 miles of gravity <br />sewer collection system and 2 miles of force main. Services included design, <br />preparation of construction plans and contract documents, permitting, bidding, <br />construction management and observation through project closeout and start-up <br />services as well as assistance in securing funding of the project. <br />9P] <br />
The URL can be used to link to this page
Your browser does not support the video tag.