Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for Each key person.) <br />19. RELEVANT PROJECTS <br />12. NAME <br />16. EDUCATION (Degree and Specialization) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />15. FIRM NAME AND LOCATION (City and State) <br />13. ROLE IN THIS CONTRACT <br />a. TOTAL b. WITH CURRENT FIRM <br />14. YEARS OF EXPERIENCE <br />UNIVERSITY OF MIAMI, CORAL GABLES, FLORIDA 1995B.S. IN ELECTRICAL ENGINEERING, UNIVERSITY OF MIAMI, CORAL GABLES, FLORIDA 1995B.S. IN APPLIED PHYSICS <br />CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL <br />2012-2016 N/A <br />(1) TITLE AND LOCATION (City and State) <br />a. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDMiddle Beach Recreational Corridor Lighting ProjectCity of Miami Beach, Florida <br />Photometric design to determine fixture spacing and lighting levels on walkway. Conduct electrical lighting and power design for required beach walk between 46th and 64th Street Parks. Coordination with Florida Department of Environmental Protection to make sure the selected light fixtures are turtle friendly and meet their requirements. Conduct utility coordination to provide power to beach-walk project limits. Coordination with city in selection of turtle friendly light fixture. Approximate fees were $50,200.00 <br />Check if project performed with current firmX <br />2015-2016 N/A <br />(1) TITLE AND LOCATION (City and State) <br />b. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDCity of Miami Beach Police Station Generator ReplacementCity of Miami Beach, Florida <br />Provide Electrical Engineering services for the design and specification of emergency electrical system upgrades for the Miami Beach Police Station, Old City Hall, and 12th Street Parking Garage complex. Services to include the development and delivery of electrical construction plans. Generator and switchgear review, selection, and specifications development. Includes coordination with city maintenance personnel and project manager to select suitable generators and switchgear that meet the city’s requirements in terms of performance and budget. Also includes the development of technical specifications for the proposed electrical work and equipment including electrical general requirements, materials and methods, raceways, conductors, switchgear, grounding, and emergency system/generator. Approximate fees were $43,000.00 <br />Check if project performed with current firmX <br />2015-2016 N/A <br />(1) TITLE AND LOCATION (City and State) <br />c.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDMills Pond Park Soccer Field Lighting Updated ProjectCity of Fort Lauderdale, Florida <br />The electrical scope of work for this project was to provide sports lighting for three soccer/lacrosse fields in an existing park. Approximate fees were $82,000.00 <br />Check if project performed with current firmX <br />2015-2016 N/A <br />(1) TITLE AND LOCATION (City and State) <br />d. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDRice Neshap Utility Service Complex Emergency Generator Upgrade; City of Boca Raton, Florida <br />Modify the exhaust system of the emergency generators to meet the requirements of the United States Environmental Protection Agency (USEPA) Reciprocating Internal Combustion Engines National Emission Standards for Hazardous Air Pollutants (RICE NESHAP) Rule. This work order is to prepare construction plans and technical specifications for retrofitting six emergency generator engines and two high service pump engines with catalytic converters that will reduce the carbon monoxide emission levels to RICE NESHAP requirements. Approximate fees were $49,900.00 <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />JOSE A. JIMENEZ ELECTRICAL ENGINEER/LIGHTING DESIGN 22 1.5 <br />100