My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:36:42 AM
Creation date
9/6/2018 11:29:25 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20. EXAMPLE PROJECT <br /> KEY NUMBER <br />2012 Ongoing <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.)01 <br />23. PROJECT OWNER’S INFORMATION <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />21. TITLE AND LOCATION (City and State) <br />a. PROJECT OWNER <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />22. YEAR COMPLETEDSAGE BEACH - OFFSITE ROADWAY IMPROVEMENTS; CITY OF HOLLYWOOD, FL <br />Property Markets Group <br />CGA was retained by PMG Driftwood LLC to provide civil site planning, permitting, and preparation of Construction Documents for two new residential towers located on Iris Terrace, east of SR A1A in Hollywood, FL. The project consisted of civil site as well as the offsite improvement within City R/W and CRA jurisdiction on Iris Terrace, South Surf Road and Jasmine Terrance. The roadway was regraded in order to tie into the new, higher finish floor elevations required. New sidewalk, landscaping, lighting, underground utilities and drainage were included in the complete roadway reconstruction of the adjacent streets. CGA provided the “utility layout” sheet which incorporated the design from each of the utility providers and put them on one plan sheet with the other roadway, drainage, water and sewer improvements shown in order to verify horizontal and vertical clearances as well as fit the required equipment within the right-of-way. A Surface Water Management License for the new facilities was obtained from Broward County Environmental Resources and Growth Management Department for the work within the City’s R/W requiring approximately 250 LF of exfiltration trench under the roadway. Two FDOT permits were also required to complete the streetscape improvements where Iris Terrace intersects SR A1A. An FDEP drainage well permit was obtained in order to install two drainage wells, one for each of the two buildings. The services provided were completed in a timely manner and under budget. The project is currently in the final stages of construction. <br />Firm’s fees: $180,250 <br />Aaron SinnesConstruction Director 305.917.1070 <br />Calvin, Giordano & Associates, Inc.a.Fort Lauderdale, FL Civil Site Planning, Permitting, Construction Documents <br />b. <br />c. <br />d. <br />e. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />121
The URL can be used to link to this page
Your browser does not support the video tag.