My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:36:42 AM
Creation date
9/6/2018 11:29:25 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Town of Miami Lakes, Florida, Qualification Based Continuing Contract - <br />Various Projects Ongoing Ongoing <br />Town of Miami Lakes Mr. Mario Palo 305-364-6100 <br />Nutting Engineers of Florida, Inc. was retained by the <br />Town of Miami Lakes to perform geotechnical <br />exploration/engineering services, laboratory testing, and <br />construction materials testing services for various park <br />improvement projects. <br />Optimus Park Clubhouse, 6411 NW 162nd Street, <br />Miami Lakes <br />Construction of a new approximately 4,000 SF clubhouse <br />building and associated drainage improvements. <br />Sevilla Estates Park Improvements, NW 169th <br />Terrace and NW 89th Court, Miami Lakes <br />Construction of a new picnic shelter, playground, <br />basketball half court, observation pier, and asphalt paved <br />walkways. <br />Park East Park Improvements, 6023 NW 154th Street, <br />Miami Lakes <br />Construction of a new youth Center, basketball court, two <br />(2) picnic areas, and a dumpster enclosure. <br />Town of Miami Lakes Government Center, 15501 NW <br />67th Avenue, Miami Lakes <br />Construction of a new 2-story, ~25,000 SF Government <br />Center and associated parking lot. <br />At the completion of the on-site work, the representative <br />soil samples collected in the field were returned to our <br />laboratory to classify the soils and to determine natural <br />water content, organic content, and/or sieve analysis. An <br />engineering report including graphic logs of our findings, <br />a test boring location plan, a description of our findings <br />and general site preparation and foundation design <br />recommendations for support of the proposed <br />improvements was provided. <br />Projects via Consultants <br /> - Miami Lakes Rubberized Sidewalk, Miami Lake Way <br />North btwn. NW 153rd Street and Miami Lake Drive East <br /> - Miami Lakes Emergency Generator, 16547 NW 87th <br />Avenue <br />Nutting Engineers of Florida, Inc. Miami, Florida Geotechnical Engineering Firm- full <br />scope of services <br />6 <br />20. EXAMPLE PROJECTF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S KEY NUMBERQUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 PAGE 9(REV. 3/2013) <br />a. <br />b. <br />c. <br />d. <br />e. <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />138
The URL can be used to link to this page
Your browser does not support the video tag.