Laserfiche WebLink
20. EXAMPLE PROJECT <br /> KEY NUMBER <br />2016 <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.)2 <br />23. PROJECT OWNER’S INFORMATION <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />21. TITLE AND LOCATION (City and State) <br />a. PROJECT OWNER <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />22. YEAR COMPLETEDFDOT I-95 Expressway, Broward County <br />FDOT <br />US Utility Potholing & Air Excavation was responsible for collecting SUE Data to aid in the design and installation for future foundations for the widening of I-95 Expressway. We were requested to locate mark and physically verify existing utilities that may be in conflict with proposed foundations on the widening of I-95 Expressway Overpasses. Requested utilities were verified with the use of vacuum excavation methods and depths measured with grade rod. Our crews collected data and marked with either PK Nails and Paint or Stake and Feather along with providing the Surveying Firm of Hadonne a detailed report of utilities located. <br />Cost of our services on this project were $18,970.00 <br />Abraham Hadad (305) 207-6845 <br />Hadonnea.Doral, FL Surveying Firm <br />b. <br />c. <br />d. <br />e. <br />STANDARD FORM 330 (1/2004)AUTHORIZED FOR LOCAL REPRODUCTION <br />MANDATORY USE DATE OF FORM 6/2004 149