Laserfiche WebLink
20. EXAMPLE PROJECT <br /> KEY NUMBER <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.)8 <br />23. PROJECT OWNER’S INFORMATION <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />21. TITLE AND LOCATION (City and State) <br />a. PROJECT OWNER <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />22. YEAR COMPLETEDPine Ave Drain ImprovementsLauderdale by the Sea, FL <br />State Contracting & Engineering <br />To verify and mark the elevation of existing utilities with the use of Air Vacuum Excavation methods. Utilities were all marked using paint. <br />Paul Carty (954) 931-3857 <br />State Contracting & Engineeringa.Hollywood, FL Prime Contractor <br />b. <br />c. <br />d. <br />e. <br />STANDARD FORM 330 (1/2004)AUTHORIZED FOR LOCAL REPRODUCTION <br />MANDATORY USE DATE OF FORM 6/2004 155