Laserfiche WebLink
2013 Ongoing <br />(1) TITLE AND LOCATION (City and State) <br />d. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDLloyd Estates Residential ImprovementsOakland Park, Florida <br />CGA was retained by the City of Oakland Park to address flooding issues in an older residential neighborhood. The project involves the installation of swales/exfiltration trenches, piping and other improvements within the upland public right of ways. The project also involves the installation of two (2) new outfalls into the Sleepy River; dredging, a new sluice gate and new seawalls in the river; the construction of a pump station and the creation of a bio-swale/river overflow area within property adjacent to the river. CGA environmental staff conducted all site assessments for permitting, designed the bio-swale stormwater overflow area, and processed permits through the U.S. COE, the SFWMD and Broward County. Permitting challenges with this project included close coordination with the SFWMD operations staff on project interactions with the C13 canal, also amending a sovereign submerged lands lease for newdredge areas. CGA’s fees: $520,000. <br />Check if project performed with current firmX <br />2018 Ongoing <br />(1) TITLE AND LOCATION (City and State) <br />e. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDDrainage ImprovementsHallandale Beach, Florida <br />Responsible for all site assessments and obtaining permits through the US COE and Broward County; Broward County reviewed and issued the SFWMD permit through the delegation agreement. The project involved the installation of a sluice gate, and new seawalls and also involved the construction of a pump station within manmade City owned canals. <br />Check if project performed with current firmX <br />2006 Ongoing <br />(1) TITLE AND LOCATION (City and State) <br />f. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDPembroke HarborPembroke Pines, Florida <br />This project is a 168-acre residential and commercial development project located in Pembroke Pines that required 35 acres of on-site mitigation in addition to the purchase of mitigation bank credits. CGA environmental staff provided final permit coordination and permit modification services; final design of the mitigation area and provided bidding services for the installation and maintenance of the mitigation area. CGA provided mitigation construction oversight and conducted the five year compliance monitoring for this project. CGA continues to have a post-compliance management and oversight contract for this site. CGA’s fees: $1.2 million. <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />2015 2015 <br />(1) TITLE AND LOCATION (City and State) <br />g <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDIntracoastal Park SeawallSunny Isles Beach <br />Obtained environmental permits, conducted the site assessments, including shoreline and submerged aquatic vegetation surveys, for new outfalls into the Lake Worth Creek Aquatic Preserve which is recognized as Outstanding Florida Waters. Conducted the investigations to complete and submit the environmental LAP documentation. <br />Check if project performed with current firmX <br />2007 2014 <br />(1) TITLE AND LOCATION (City and State) <br />h. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDA-1-A Improvements and Bike LanesTown of Jupiter <br />CGA environmental staff obtained immediate emergency authorization from the jurisdictional agencies to begin repairs on a collapsed portion of seawall along the City’s Intracoastal Park and kept DERM the US COE, and DEP continuously apprised of all activity. CGA quickly responded to the City’s request for design, permitting and construction inspection of the emergency demolition and replacement. Due to the age and deteriorated state, the entire 669 linear feet of seawall was replaced. CGA expedited the permit review process while the Contractor was on-site performing emergency repairs. <br />Check if project performed with current firmX <br />99