Laserfiche WebLink
28. EXAMPLE PROJECTS LISTED IN SECTION F <br />(Fill in “Example Projects Key” section below before completing table. <br />Place “X” under project key number for participation in same or similar <br />role.) <br />29. EXAMPLE PROJECTS KEY <br />NUMBER <br />1 <br />3 <br />2 <br />4 <br />5 <br />NUMBER <br />6 <br />8 <br />7 <br />9 <br />10 <br />TITLE OF EXAMPLE PROJECT (From Section F) <br />Meadowbrook Pump Station and Phase I Stormwater Improvements <br />Indian Trace Development District Stormwater Management Master Plan <br />SW Hallandale Beach Drainage Improvements <br />Lloyd Estates Residential & Industrial Improvements <br />Stormwater Master Plan <br />TITLE OF EXAMPLE PROJECT (From Section F) <br />Hallandale Beach NE Quadrant Drainage Improvments <br />G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br />26. NAMES OF KEY <br />PERSONNEL <br />(From Section E, Block 12) <br />27. ROLE IN THIS <br />CONTRACT <br />(From Section E, Block 13)1 52 63 7 948 10 <br />xxCurt A. Keyser, PE Project Manager <br />xx xJenna Martinetti, PE Civil Engineer <br />Mohammed Sharifuzzaman, PE <br />Civil Engineer <br />xx xx x <br />Hydraulic <br />Rainier Gonzales, EI Hydraulic <br />xJorge R. Cervantes, PE Electrical Engineer <br />xJose Jimenez Electrical Engineer <br />x xx xxJim Hart, PE Mechanical <br />x xxSandra Lee, AICP, CEP, LEED AP BD+C, CGM Permitting <br />x x x <br />James Messick, PE Permitting <br />x x <br />Robert McSweeney, PE Construction Administration <br />xxBruce Bernard Operation Manager/Field Supervisor <br />xSteve Watts, PSM Survey and Mapping <br />Nicholas B. Mahon, PE <br />Survey and MappingPablo Dominguez <br />STANDARD FORM 330 (REV. 8/2016) PAGE 4 <br />x x <br />x x <br />x <br />x <br />x <br />x x <br />x x <br />x x <br />x x <br />113