My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:26:28 PM
Creation date
12/11/2018 2:41:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT <br /> KEY NUMBER <br />1 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Storm Water Pump Station Improvements – D6 and D7 <br />Town of Palm Beach, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2010 2011 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER <br />Town of Palm Beach Mike Roach 561-838-5440 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT <br /> <br />AGA worked with the Prime Consultant to completely renovate the existing concrete pump stations. The project <br />included a condition survey and feasibility study followed by the renovation project. Construction documents <br />included concrete restoration, reconfiguration of the pump station tops and side chambers, and replacement of <br />all deteriorated steel, pipe supports and grating. The project also included construction phasing to keep at least <br />one pump station in operation throughout construction. <br /> <br />AGA provided structural engineering services from design through construction administration. <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME (2) FIRM LOCATION(City and State) (3) ROLE <br />Alan Gerwig & Associates, Inc. Wellington, Florida Structural Engineering. <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION(City and State) (3) ROLE <br /> <br />Alan Gerwig & Associates, Inc. STANDARD FORM 330 (REV. 3/2013) <br /> <br /> <br />123
The URL can be used to link to this page
Your browser does not support the video tag.