My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:26:28 PM
Creation date
12/11/2018 2:41:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Key Team Members: Tom Mullin, PE, Chief Engineer; Gregory Stelmack, PE, Principal <br />Engineer. <br /> <br />RADISE provided Geotechnical Engineering Services including an ACI Certified Concrete <br />Construction inspector to verify that the curbs are constructed in accordance with the project <br />plans, specifications and approved shop drawings. On site activities included visits the site as <br />requested by the contractor to examine the formwork and reinforcement for the curbs, and <br />providing a written approval of the work when visual inspection indicates compliance with the <br />project documents. <br />154
The URL can be used to link to this page
Your browser does not support the video tag.