My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:26:28 PM
Creation date
12/11/2018 2:41:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Ray Bullard WRF Reuse Filter #3, City of West Melbourne, FL <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project added a third filter, a rotating disk type that will allow one existing filter to be decommissioned. The filter controls were added into the existing SCADA system. As part of the SCADA system improvements, additional radio communications was added for future flexibility. Controls (pH, chlorine, and turbidity) were also added into the existing SCADA network. <br />f. <br />(1) TITLE AND LOCATION (City and State) <br />Carbonic Acid System for pH Reduction, City of <br />Pembroke Pines, FL <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design CO2 pH reduction system for existing 12 MGD facility. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />Modify Existing CO2 Gas Fed System for pH Reduction, <br />Town of Davie, FL <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Modify existing gas facility to provide carbonic acid for pH reduction at existing 4 MGD facility. <br />h. <br />(1) TITLE AND LOCATION (City and State) <br />Air Header Replacement, Town of Davie, FL. <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design replacement air header for 1 MGD package plant. <br />i. <br />(1) TITLE AND LOCATION (City and State) <br />Pump House Design, City of Dania Beach, FL. <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design pump house rebuild using 3D modeling techniques. Evaluate process operating conditions to specify pump, engine, and control equipment. <br />j. <br />(1) TITLE AND LOCATION (City and State) <br />Lift Station Design, City of Oakland Park, FL. <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm All aspects. Review flow data. Specify pump. Design instrumentation, and controls. Add SCADA to system. <br />j. <br />(1) TITLE AND LOCATION (City and State) <br />Odor Control Study, City of Pembroke Pines, FL. <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Reviewed source of odors from wastewater plant. Troubleshoot source of odors from several on-site air scrubbers. Write report summarizing odor control alternatives, optimizing odor control strategies, with associated capital and maintenance costs. <br />97
The URL can be used to link to this page
Your browser does not support the video tag.