Laserfiche WebLink
@�A <br />Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />3D Subsurface Imaging • Utility Coordination <br />CAS is currently reaching completion on many projects as per the current work listing below and will <br />be available to accept new projects. Listed below is a chart showing current and future workload with <br />percentage of completion. <br />CLIENT <br />PROJECT <br />PERCENTAGE COMPLETE <br />DESIGN <br />CONSTRUCTION <br />City of Pompano Beach <br />SW 2nd Street Drainage Improvements <br />80% <br />0% <br />City of Lake Worth <br />Lake Osborne Estates Water Main <br />90% <br />0% <br />Replacement Project - Phase I <br />Berta Management <br />1951 NW 19th Street Fire Main <br />95% <br />0% <br />Improvements <br />City of Lauderhill <br />Green Leaf Filter Rehabilitation <br />100% <br />35% <br />City of Margate <br />2018 System -Wide Water Main <br />80% <br />0% <br />Improvements- Phase II <br />City of Margate <br />Lift Station #7 Rehabilitation <br />90% <br />0% <br />City of Margate <br />Lift Station #21 Rehabilitation <br />100% <br />OUT TO BID <br />City of Margate <br />Replace Existing WWTP Triplex Lift Station <br />100% <br />0% <br />City of Sweetwater <br />Stormwater Improvements Phase 2B -N <br />100% <br />0% <br />Florida Department of <br />Statewide 3D Radar Tomography Support <br />100% <br />N/A <br />Transportation <br />Glades County <br />Washington Park Sanitary Sewer <br />10% <br />0% <br />Improvements <br />Glades County <br />FDEP WWTP Operating Permit Renewal <br />100% <br />N/A <br />HDR <br />Port Everglades Slip 1 Improvements <br />100% <br />0% <br />Indian Trail Improvement <br />Acreage Community Park <br />100% <br />70% <br />District <br />Indian Trail Improvement <br />1400, Avenue North Roadway <br />District <br />Improvements <br />100% <br />0% <br />Miccosukee Tribe of <br />Water Main Replacement <br />100% <br />50% <br />Indians of Florida <br />Shah Drotos & Associates <br />Port Everglades Pier 2 Radar Scan <br />100% <br />N/A <br />Spring Lake Improvement <br />District <br />Stormwater Pump Station Rehabilitation <br />100% <br />80% <br />Spring Lake Improvement <br />Design & Build New WWTP <br />100% <br />OUT TO BID <br />District <br />Sunshine Water Control <br />West Outfall Canal Widening <br />100% <br />N/A <br />District <br />Sunshine Water Control <br />Coral Springs Drive Bridge Canal Widening <br />100% <br />0% <br />District <br />Town of Pembroke Park <br />Meekins Lake Stormwater Analysis <br />100% <br />0% <br />Town of Pembroke Park <br />SW 25th Street Stormwater Improvements <br />100% <br />0% <br />- Phase I <br />Village of Biscayne Park <br />Stormwater Master Plan <br />100% <br />N/A <br />Village of EI Portal <br />Sanitary Sewer Master Plan <br />100% <br />N/A <br />City of Belle Glade <br />SW 3rd Street Drainage Improvements <br />50% <br />0% <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 <br />W <br />