My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:27:16 PM
Creation date
12/11/2018 3:03:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />3D Subsurface Imaging • Utility Coordination <br />SIMILAR PROJECT EXPERIENCE <br />STORMWATER PUMP STATION MPROVEMENT PROJECTS <br />• City of Miami Beach - Palm & Hibiscus Islands Infrastructure Improvements Project, City of <br />Miami Beach, Florida <br />Status: Completed 2015 <br />Prime Consultant: Wade Trim Associates, Inc./Stantec, Inc. <br />Subconsultant: CAS <br />Key CAS Staff: Stephen C. Smith, William H. Landis, Orlando A. Rubio, Tony Gomes <br />Scope of Work: Drainage, roadway and stormwater pump station design, preparation of <br />construction plans for design -build team, permitting, coordination with team members, <br />construction observation through project closeout for infrastructure improvements consisting <br />of water main upgrades, utility relocation, new drainage systems with three (3) stormwater <br />pump stations (two 60 HP pumps per emergency generator with ATS) along with <br />Hydrodynamic Separators (Downstream Defenders) for water quality treatment and Tideflex <br />Checkmate Valves for tidal backflow prevention purposes, landscaping and roadway <br />reconstruction to address sea level rise. This project was completed on time and within <br />budget. <br />Design Cost: $194,000 <br />Construction Cost Estimate: $7,000,000 <br />Actual Construction Cost: $8,000,000 <br />• Town of Golden Beach - Stormwater Improvements Phase III & IV, Golden Beach, Florida <br />Status: Completed 2011 <br />Prime Consultant: CAS <br />Key CAS Staff: Stephen C. Smith, William H. Landis, Orlando A. Rubio, Robert D. Keener, Tony <br />Gomes, William Tanto <br />Scope of Work: Survey, utility locates, design consistent with Stormwater Master Plan, <br />permitting, cost estimating, construction management and observation, survey for record <br />drawings, testing, startup and certifications through project close-out for the construction of a <br />stormwater submersible master pump station (two 28 HP pumps per emergency generator <br />with ATS), 14,500 linear feet of drainage pipe and pressure main (16°-72° diameter), 205 <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 <br />154 <br />
The URL can be used to link to this page
Your browser does not support the video tag.