My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:27:16 PM
Creation date
12/11/2018 3:03:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U CJ Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering • 3D Subsurface Imaging • Utility Coordination <br />CITY OF MOORE HAVEN <br />STORMWATER SYSTEM IMPROVEMENTS <br />Responsibilities: <br />Project Description: <br />The City of Moore Haven Stormwater System Improvements <br />project consists of the construction of a gravity stormwater <br />drainage system along with two master stormwater pump <br />stations including force mains and canal dredging for the <br />Ranch Lakes Estates community. Construction included the <br />installation of 7,103 linear feet of HDPE drainage pipe ranging <br />in diameter from 15 -inch to 48 -inch, 1,044 linear feet of force <br />main, 76 drainage structures and two duplex stormwater <br />pump stations. The total design costs for the project was <br />$271,175 with construction costs totaling $2,031,000. The <br />project began in February 2012 and was completed in 2015 <br />with no liquidated damages. <br />Planning, survey, utility locates, design, permitting, bidding assistance and construction <br />management and inspection services. <br />Key Personnel: <br />Gene R. Schriner, P.E. - President; Robert Keener, P.S.M. - Vice President: Survey; Orlando A. <br />Rubio, P.E. - Senior Supervising Engineer; James Driscoll - Director of Utility Locates; William <br />Tanto - Senior Field Representative <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 <br />168 <br />
The URL can be used to link to this page
Your browser does not support the video tag.