My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:27:16 PM
Creation date
12/11/2018 3:03:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
29. EXAMPLE PROJECTS KEY <br />NO. <br />G. KEY PERSONNEL <br />PARTICIPATION IN EXAMPLE PROJECTS <br />26. NAMES OF KEY <br />PERSONNEL <br />(From Section E, <br />Block 12) <br />Stephen C. Smith, P.E. <br />27. ROLE IN THIS <br />CONTRACT <br />(From Section E, <br />Block 13) <br />Contract Director / <br />Project Manager <br />1 28. EXAMPLE PROJECTS <br />I (Fill in "Example Projects Key" section below before completing table. Place <br />"X" under sect key number for participation in same or similar role.) <br />1 2 3 4 5 6 7 8 9 10 <br />X X X X X X X X X <br />Gene R. Schriner, P.E. <br />Quality Assurance <br />/ Quality Control <br />1 <br />NE 17411 Street Stormwater and Pavement <br />6 <br />Park Road & SW 25t1 Street Pump Station <br />Improvements <br />X <br />X <br />Jim R. Orth, P.E. <br />Production Team <br />Leader <br />2 <br />Capital Improvements Project Phase III & IV <br />Avenue R Stormwater Improvements <br />Stormwater Collection System with Master <br />7 <br />X <br />Orlando A. Rubio, P.E. <br />Project Engineer — <br />Stormwater <br />X <br />X <br />X <br />City of Sweetwater <br />X <br />Palm & Hibiscus Island Stormwater & <br />X <br />X <br />X <br />William H. Landis, P.E. <br />Project Engineer— <br />Stormwater <br />X <br />X <br />X <br />X <br />X <br />9 <br />SW 52nd Avenue (North) Roadway and <br />Robert Keener, PSM <br />Project Surveyor <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />Jim Driscoll <br />Director of SUE <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />Raul Carbonell <br />Locates Supervisor <br />X <br />X <br />X <br />X <br />X <br />X <br />Tony Gomes <br />Sr. Field Rep <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />William Tanta <br />Sr. Field Rep <br />X <br />X <br />29. EXAMPLE PROJECTS KEY <br />NO. <br />TITLE OF EXAMPLE PROJECT (FROM SECTION F) <br />NO. <br />TITLE OF EXAMPLE PROJECT (FROM SECTION F) <br />City of Sunny Isles Beach <br />Town of Pembroke Park <br />1 <br />NE 17411 Street Stormwater and Pavement <br />6 <br />Park Road & SW 25t1 Street Pump Station <br />Improvements <br />Town of Golden Beach <br />City of Moore Haven <br />2 <br />Capital Improvements Project Phase III & IV <br />Avenue R Stormwater Improvements <br />Stormwater Collection System with Master <br />7 <br />Pump Stations <br />City of Miami Beach <br />City of Sweetwater <br />3 <br />Palm & Hibiscus Island Stormwater & <br />8 <br />Stormwater & Pump Station <br />Roadway Improvements <br />Improvements Phase IV <br />Town of Pembroke Park <br />Town of Pembroke Park <br />4 <br />FDOT 1-95 Stormwater Pump Station <br />9 <br />SW 52nd Avenue (North) Roadway and <br />Drainage Improvements <br />City of Sweetwater <br />City of Pompano Beach <br />5 <br />Stormwater and Pump Station <br />10 <br />SW 2nd Street Drainage Improvements <br />Improvements (Phase 2B North & South) <br />72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.