Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Marcus Unterweger, P.E., S.I., LEED AP <br />Inc. Oakland Park, Florida <br />Masters of Engineering: Dipl. Ing. (Univ.)Technical University <br />of Munich, Germany 1999 <br />Master of Business: MBA Business School of Edinburgh, <br />Britain, 2004 <br />14. YEARS EXPERIENCE <br />Registered Professional Engineer: Florida: PE 63860, <br />West Virginia: PE 20193 <br />Special Inspector/Threshold Buildings: Florida: 7027309 <br />American Society of Civil Engineers (ASCE) American Institute of Steel Construction (AISC) <br />American Concrete Institute (ACI) Post Tension Institute (PTI) <br />19. RELEVANT E <br />STANDARD FORM 330 (REV. 3/2013) PAGE 2 <br />0 <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />North Miami Beach -Water Treatment Plant <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Miami Gardens, Florida <br />2012 <br />2014 <br />a. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />MUE was involved in the upgrades and modifications made at the North Miami Beach <br />X Check if project performed with current fine <br />Norwood-Oeffler Water treatment plant. Our responsibilities included: structural design of a <br />new slab on grade and new parapets and vertical parapet extensions, in the electrical room; <br />structural design of infill for existing wall openings and a new roof above the electrical room. <br />We also provided wind pressures for new windows, doors and roofing. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Pompano Water Plant <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Pompano Beach, Florida <br />2012 <br />2012 <br />b <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />® Check if project performed with current firm <br />Structural design and calculations for modifications made to the exterior building an <br />window replacement. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Solid Waste Authority <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />West Palm Beach, Florida <br />2012 <br />2013 <br />I <br />C. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Check if project performed with current firm <br />Analysis and design and sketches of cold formed metal stud framing for ten distinct <br />configurations for modifications made to the building structure. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />I CONSTRUCTION (if applicable) <br />d <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Check if project performed with current firth <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />e. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Check if project performed with current firm <br />STANDARD FORM 330 (REV. 3/2013) PAGE 2 <br />0 <br />