Laserfiche WebLink
Name Fiscal Year Adoption Date (mm/dd/yyyy)
‎(12-06-01)‎ Construction Management for Gateway Park[Icon]
‎(13-08-01)‎ Design build svcs for Gateway Park Pedestrian bridge- STEP 1[Icon]
‎(14-07-02)‎ Continuing Professional Architectural and Engineering Services - Individulas Only CCNA[Icon]
‎(15-04-01)‎ Architectural Design Services for a New Facility at 18080 Collins Ave.[Icon]
‎(15-08-02)‎ CMAR for Government Center Annex at 18080 Collins Ave.[Icon]
‎(16-04-02)‎ Landscape Architect Services[Icon]
‎(16-06-01)‎ Shoreline Surveying and Mapping Consulting Services[Icon]
‎(16-06-02)‎ Landscape Architect Services ‎(Final)‎[Icon]
‎(16-12-01)‎ Professional Planning and Zoning Cosult Svcs[Icon]
‎(17-12-01)‎ Professional Arch Srvcs Interior Remodel Govt Ctr Lobby and Gateway Park Internal Space Build[Icon]
‎(18-02-01)‎ Marine and Coastal Professional Engineering Consulting Services[Icon]
‎(18-08-01)‎ Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements[Icon]
‎(18-11-01)‎ Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation ‎(CCNA)‎[Icon]
‎(19-02-02)‎ Pre-Qualification for Stage Production Services[Icon]
‎(19-11-01)‎ Prof Eng and Arch Srvcs Ped Bridge REVISED[Icon]
‎(20-07-01)‎ Continuing Professional Consulting Services ‎(CCNA)‎[Icon]
‎(20-10-01)‎ Professional Engineering and Architectural Services for Ped.[Icon]
‎(21-10-01)‎ Space Needs Assessment Feasibility Study ‎(CCNA)‎[Icon]
‎(21-11-01)‎ Professional Planning and Zoning Consulting Services including Civil and Traffic Engineering CCNA FINAL.doc[Icon]
‎(22-06-01)‎ Landscape Architectural Services CCNA[Icon]
‎(22-10-01)‎ Canopy and Awning Services on an As-Needed Basis[Icon]
Page 2 of 2
1
2
46 Entries
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.