My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2072
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2013 3:45:21 PM
Creation date
6/27/2013 11:43:31 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2072
Date (mm/dd/yyyy)
06/20/2013
Description
1st Amd to Agmt w/Keith & Schnars, Utility Undergrounding Con, Phase II
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 GENERAL DESCRIPTION of PROCESS <br />In the initial work authorization, the process of undergrounding utilities was outlined as a three - phased <br />approach. CONSULTANT is currently engaged in providing services to CLIENT for the first phase. This <br />work authorization is for the second of three work authorizations anticipated for this project. A full <br />explanation of the undergrounding process and description of phases was provided in the initial work <br />authorization. A summary is provided as follows: <br />Phase 1• Assessment: <br />The purpose of Phase t is to establish the parameters for the project including preliminary schedule, <br />critical timelines, existing conditions, coordination with utilities, outlining FDOTs RRR project, facilitate <br />FP &L design process, and identifying issues with potential impact to the project. <br />The intent of this first phase is to collect information necessary to create a base -file depicting existing <br />conditions for use in proposed design. Information in the form of atlases, right -of -way maps, survey, <br />plat, and as- builts is collected and analyzed for sufficiency. If necessary, but unavailable, additional <br />information shall be obtained through subsequent work authorizations. <br />Phase 2 — Design and Permitting: <br />In Phase 2 plans are generated. The information collected in Phase 1 will be verified and used for the <br />proposed design. FP &L will provide design for their system; CONSULTANT will coordinate and <br />prepare plans identifying requirements of other utilities. Once completed, CONSULTANT shall <br />incorporate FP &L's design into the plans with other utility improvements and coordinate. In addition to <br />plans, this phase includes coordination with MOT and various permitting agencies. <br />At the conclusion of this phase, all design issues and requirements have been identified, construction <br />documents coordinating and addressing utility concems are prepared, easement requirements are <br />acknowledged for procurement, and approvals from appropriate permit agencies obtained. In addition, <br />the project has been circulated among stakeholders and an estimated cost of improvements provided. <br />Phase 3 — Bidding/Construction: <br />Phase 3 involves Construction Phase services. It includes preparation of bid documents, facilitating <br />and making recommendation for award, CEI services, close -out and certifications. Periodic <br />inspections are expected and will be supported by project management to avoid problems with transfer <br />and delivery. <br />Professional Services Agreement <br />Project Name: Utifrty Underarounding Consulting - Phase II <br />Project Location: Sunny Isles Beach, FL <br />Irk" g KEITH and SCHNARSr P A. K &S Proposal No.: P5098.MK <br />�: ENGINEERS, PLANNERS, SURVEYORS Revised June 4, 2013 Page 2 <br />