My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2072
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2013 3:45:21 PM
Creation date
6/27/2013 11:43:31 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2072
Date (mm/dd/yyyy)
06/20/2013
Description
1st Amd to Agmt w/Keith & Schnars, Utility Undergrounding Con, Phase II
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
After construction of underground infrastructure is complete, the right -of -way will be tumed over to <br />FOOT for their RRR project. Following the RRR project, the transfer of overhead utilities into the <br />underground infrastructure will commence. <br />3.0 SCOPE OF SERVICES <br />Services to be provided by CONSULTANT under this Work Authorization pertain to Project Design and <br />Permitting (Phase 2) only as related to approximately 2.2 miles of Collins Avenue. This phase includes <br />preparation of plans, incorporation of FP &L design, identifying easement requirements, coordinating with <br />FOOT proposed lighting plan, define and coordinate design requirements of all utility providers and obtain <br />permit approvals. In an effort to avoid conflict with FDOT's RRR project, the intent of this work <br />authorization is to prepare plans for the infrastructure improvements necessary for undergrounding <br />including surface- mounted equipment outside of the right -of -way such as conduits, manholes, vaults, <br />junction boxes, transformers, and switch -gear. Plans will show proposed location and size of equipment, <br />conduits, and structures as necessary to avoid conflict with existing utilities. The proposed undergrounding <br />improvement will be installed prior to the commencement of the FOOT RRR project. <br />The improvements constructed with these plans will provide the means to transfer the overhead utilities <br />underground without impact to the RRR improvements. Tasks for subsequent phases will be defined <br />under separate work authorizations. Services for this work authorization shall include the following. <br />TASK 1- Prepare Base File <br />Survey Services: <br />Subtask S.1 - Supplemental Survey: Because the limits of undergrounding project extend <br />beyond the limits of the FOOT RRR project, additional right -of -way survey is required. In providing <br />additional survey services, CONSULTANT assumes FDOT survey files to be referenced into the <br />base file. In addition, CONSULTANT assumes FOOT horizontal and vertical control to be provided <br />throughout the entire project corridor (approx 2.2 miles). The limits of the Supplemental Design <br />Survey along Collins Avenue are from the north limits of Northeast 192nd Street to the median just <br />north of Northeast 196th Street. The limits shall extend approximately 5 feet east and west outside <br />the right of way line of Collins Avenue. Services include the location of asphalt, concrete, surface <br />features of utilities, rim and inverts of gravity utility lines (sanitary, stone sewer), striping and <br />elevations on an approximate 50 foot interval with high and low areas also obtained. <br />Professional Services Agre=_ment <br />Project Name: Utility Undergrounding Consulting— Phase II <br />Pmject Location: Sunny Isles Beach, FL j <br />_'�� 3 KEITH and SCHNARS, P A. K&S Proposal No.: P5098.MK <br />ENGINEERS, PLANNERS, SURVEYORS Revised June 4, 2013 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.