My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5-2.3 QC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Responses
>
TGSV Enterprises
>
Tab 4 Approach
>
Approach
>
5-2.3 QC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2019 3:35:05 PM
Creation date
3/13/2019 3:35:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No.: Superintendent's Name: <br />Project Name: Subcontractor: <br /> Initials <br />Location Subcontractor Supervisor Name:TGSV's SUB'S Date <br />Item No. Item <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />Item Comments <br />QUALITY CONTROL CHECKLIST/REPORT <br />ELECTRICAL UNDERGROUND SLAB <br />PVC conduits covered and capped to keep debri from entering them <br />Proper fitting being installed per spec <br />All materials have UL listings <br />PVC conduit & materials new & Per Specs <br />PVC glue used on all fittings <br />PVC conduits sized per drawing <br />PVC conduit installation & location per drawings and specs. <br />PVC conduit installed at proper depth <br />Installation of conduits plum & level <br />Jet line installed in conduits to assure conduits are complete and not <br />damaged under slab prior to slab pour <br />All materials stored properly <br />Areas cleaned up after completion of work each day
The URL can be used to link to this page
Your browser does not support the video tag.