My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5-2.3 QC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Responses
>
TGSV Enterprises
>
Tab 4 Approach
>
Approach
>
5-2.3 QC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2019 3:35:05 PM
Creation date
3/13/2019 3:35:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUALITY CONTROL CHECKLIST/REPORT <br /> EXCAVATION <br />Project No.: Superintendent's Name: <br />Project Name: Subcontractor: <br /> Initials <br />Location Subcontractor Supervisor Name:TGSV's SUB'S Date <br />Item Spec. Sections <br />No. Item <br />1 Prepare and submit soil notification form. <br />2 Determine disposition procedure. <br />3 Soil information is on job and reviewed. <br />4 Note elevation of water table. <br />5 Monuments and stakes are located. <br />6 Utilities to remain are located, staked and protected. <br />7 Verify utility companies have been notified. <br />8 Shoring and underpinning is provided if required. <br />9 Excavating does not cause unusual rutting. <br />10 Provide for public safety: barricades, fences etc. <br />11 Are well points required? <br />12 <br />13 Drainage ditches are maintained. <br />14 Testing, inspection and compaction as required. <br />15 Compaction is performed in lifts required. <br />16 Building layout is established. <br />17 Elevations are established. <br />18 Observe setback and batterboards. <br />19 Waterproofing protected during backfilling. <br />Item Comments <br />Is dewatering if required in accordance to site specific and master <br />dewatering plan permits?
The URL can be used to link to this page
Your browser does not support the video tag.