Laserfiche WebLink
<br />Project: <br />Location: <br />Date: <br />1 02-000 Demolition 5,600.00$ <br />2 02-050 General Requirements 55,067.50$ <br />3 02-200 Earthwork NIC <br />4 02-810 Irrigation NIC <br />5 02-900 Landscaping NIC <br />6 02-830 Fencing and Gates NIC <br />7 03-110 Augercast Piles 14,450.00$ <br />8 03-330 Concrete, Masonry, and Misc Concrete 350,000.00$ <br />9 05-500 Misc. Metals and Structural Steel 6,160.00$ <br />10 06-220 Carpentry - Rough 4,500.00$ <br />11 06-400 Millwork and Cabinetry 244,812.80$ <br />12 07-500 Roofing 14,450.00$ <br />13 07-900 Caulking & Waterproofing 570.00$ <br />14 08-100 Doors, Frames and Hardware 110,452.00$ <br />15 08-150 Overhead and Coiling doors 76,000.00$ <br />16 08-500 Glass, Glazing Metal cladding, Sliding Glass doors 117,693.00$ <br />17 09-100 Stucco 9,343.23$ <br />18 09-150 Drywall, Framing & Insulation 204,051.25$ <br />19 09-200 Acoustical ceilings 318,761.00$ <br />20 09-300 Flooring, carpets and tiles 226,450.89$ <br />21 <br />09-900 Painting 64,603.00$ <br />22 10-160 Toilet Accessories and mirrors 43,978.00$ <br />23 10-510 Misc. Specialties 9,096.00$ <br />24 11-000 Furniture's 226,859.00$ <br />25 12-000 Equipment 67,804.00$ <br />26 13-100 Special Constructions NIC <br />27 14-100 Elevators NIC <br />28 15-330 Fire Sprinkler 21,450.00$ <br />29 15-400 Plumbing 173,723.00$ <br />30 15-500 Mechanical 761,140.50$ <br />31 16-000 Electrical 1,233,239.41$ <br />32 01-000 General Conditions 382,750.73$ <br />SUBTOTAL $4,743,005 <br />33 Contractor's Overhead & Profit @ 6%$284,580 <br />38 General Liability Insurance $47,430 <br />39 Payment and Performance Bond @ 1%$796,397 <br />40 Permit Fees by owner <br />41 Estimate Contingency $0 <br />42 TOTAL CONSTRUCTION COSTS $5,871,413 <br />Construction Square Feet 18,000 <br />Cost per Square Feet $326.19 <br />1 <br />2 <br />3 <br />4 <br />Permit fees, impact fees, FPL fees by owner. <br />Plumbing system as per plans, specifications on plans starting at 5' from the building <br />HVAC system as per plans, specifications on plans and design starting at 5' from the <br />building <br />PM, Supervision, Trash Chute, Dumpsters, Signage, Safety, and Fencing <br />$0.00 <br />O.H. & P. <br />Insurance. <br />Electrical system including fixtures, Fire alarm and VA and security system <br />Bond Fee <br />Qualifications and Assumptions <br />Permit Fees are by Owner. <br />Material Testing Fees, Threshold Inspections, and Outside Agency Fees are by Owner. <br />See Qualifications and Assumptions. <br />Builder's risk insurance by owner- NIC <br />demolition, relocation and installation of new heads <br />Gateway Park <br />151 Sunny Isles Blvd Sunny Isles Beach, FL 33160 <br />3/13/2019 <br />NIS - Not in Scope <br />Storefronts, telescopic glass doors, demountable glass partitions <br />Toilet partitions, accessories, mirrors <br />Fire extinguishers, corner guards <br />Kitchen equipments <br />Curtains, entrance door mat, coordination of the FFE <br />NIS - Not in Scope <br />Stucco and plaster as per plans to match existing. <br />Drywall, framing, insulation, gyp. Brd. ceilings and fire rated walls as per plans. <br />Acousticall ceilings and panels as shown <br />Ceramic tiles, porcelain tiles,carpet, peebles, wood, rubber base <br />Exterior paint of the newstucco finished CMU, interior paint of the walls, ceilings, doors and <br />frames, decorative graffic in the kitchen-allowance <br />Overhead operable bifold <br />NIS - Not in Scope <br />Millwork in rooms, restroom vanities and restroom counter tops as per plans. <br />Patch and repair roof-allowance <br />Caulking of storefront perimeter <br />Concrete Helical Micro- Piles <br />Description <br />Demolition of the masonry walls, removal of ceiling stucco <br />Doors, frames, finish hardware <br />Concrete work, masonry and foundations at ground floor <br />Structural steel reinforcement for openings as required, railings at storage <br />Hoisting, Rough-Final Cleaning, Punchout, Safety, Temporary Structures, etc. <br />NIS - Not in Scope <br />NIS - Not in Scope <br />NIS - Not in Scope <br />Misc. blocking, wood base boards and backing as required <br />Proposal Estimate <br />ITEM DIV TRADE Total Project <br /> Confidential 3/13/2019 Page 1 of 1