Laserfiche WebLink
SHIFF1 <br /> CONSTRUCTION•DEVELOPMENT <br /> 0 <br /> • All rigging must be removed from the hoist block. <br /> • Backfill excavations if feasible. <br /> • Fuel all vehicles and emergency equipment (such as generators). <br /> • Remove fence screening, signs, banners, etc. <br /> • Secure essential traffic control devices using anchors, sandbags and"tie <br /> downs." Remove the devices only if their absence will not create unsafe <br /> driving conditions. Collect and remove nonessential barricades. <br /> • Ensure fire protection systems are operational to the extent possible and <br /> that adequate fire <br /> • Extinguishers are available. <br /> • Construction equipment should be moved to a location as far as possible <br /> from trees, structures or electrical wires, which could fall on them during a <br /> storm. Equipment, with brakes set, should also be relocated to as high an <br /> elevation as possible to reduce the likelihood of water damage and <br /> improve future access to equipment. <br /> • In addition to monitoring the progress of the storm via the Internet, the use <br /> of lightning detection equipment can provide valuable information <br /> regarding the impending storm. It is considered prudent to take shelter in <br /> the interior of a building (taking shelter in construction field trailers <br /> should be a last resort) when lightning detectors indicate that lighting is <br /> within 8 miles of the site. Work should be immediately stopped in the <br /> event of lighting. <br /> • Protect incomplete underground utilities, processes and drainage piping <br /> from flotation and the infiltration of sand and silt. <br /> • Fill water coolers and place inside gang boxes for additional weight and <br /> for the water needs of recovery personnel. Water may not be available <br /> following a storm or municipal water may be contaminated. <br /> • Make de-watering arrangements for meter pits and other in-ground vaults <br /> that contain electronic equipment. <br /> • Inform employees and subcontractors about whom to contact regarding a <br /> resumption of site activities. <br /> 1350 NE 56T"Street Suite 100 I Fort Lauderdale,Florida 33334 I t:(954)524 2575 I f:(954)524 2576 <br />