My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shift
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Responses
>
Shiff Construction
>
Shift
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 11:09:30 AM
Creation date
5/7/2019 10:37:44 AM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHIFF <br /> CONSTRUCTION•OEVELOPMENT <br /> a <br /> • If employees are to remain onsite to operate pumps or minimize damage, <br /> safety is critical. Consideration must be given to the security of the shelter <br /> taken during the storm from a structural, flooding, storm-surge and <br /> projectile-impact standpoint. Consult a structural engineer to verify that <br /> the shelter protection is adequate. Depending on the severity of the storm, <br /> onsite personnel must be self-sufficient(potentially for several weeks) and <br /> will require provisions. The choice to remain during the storm, if <br /> absolutely necessary, must be entirely voluntary, well considered and not <br /> taken lightly. <br /> • Make a video/photographic record of the jobsite and surrounding <br /> properties to document the project condition and status prior to the storm. <br /> • Establish a meeting place, if possible, for key recovery members. <br /> • Inform construction personnel regarding when to leave the project site and <br /> how to determine when to return. <br /> • If treaties or agreements exist for recovery assistance by Contractors, <br /> contact them to plan <br /> • Recovery efforts. <br /> • If authorities require evacuation, immediately vacate the site. <br /> • Once the site is secure, instruct subcontractors and employees to vacate <br /> the jobsite and not to return until the danger has passed. <br /> d. When a hurricane approaches <br /> All contractors and subcontractors on site shall: <br /> • Ensure that all loose scrap material is gathered up and disposed of in the <br /> dumpsters. <br /> • Ensure that the dumpsters are emptied. If the waste hauler is unable to pull <br /> the dumpsters, they should be securely covered with tarps to prevent the <br /> debris in them from becoming windblown hazards. <br /> • Ensure that all loose forming materials are neatly stacked. If time permits, <br /> band strap all stacks. If time is short, heavy objects can be used to secure <br /> materials. <br /> a <br /> 1350 NE 56TH Street Suite 100 I Fort Lauderdale,Florida 33334 I t:(954)524 2575 I f:(954)524 2576 <br />
The URL can be used to link to this page
Your browser does not support the video tag.