My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shift
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Responses
>
Shiff Construction
>
Shift
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 11:09:30 AM
Creation date
5/7/2019 10:37:44 AM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHIFFI <br /> CONSTRUCTION.DEVELOPMENT <br /> 0 <br /> • Ensure that all materials, tools, tool sheds, gang boxes and small equipment <br /> that can be damaged by rising water is removed from all excavations. <br /> • Ensure that the beams of all excavations are continuous and in good repair. <br /> • Secure essential barricades, with anchors, tie-downs or sand bags. <br /> • Lay flat on the ground any non-essential barricades. <br /> • Ensure that all equipment, including track cranes and excavators, scissor lifts, <br /> are relocated out of work area and set upon high ground. Lay crane booms on <br /> the ground if possible. <br /> • Top off fuel tanks on all equipment. <br /> • Ensure standby diesel powered dewatering equipment is ready to operate. <br /> Operate this equipment as conditions warrant. <br /> • Ensure that incomplete work is protected against the infiltration of sand and <br /> silt. <br /> • Turn off the power and water to the office trailers. <br /> • Ensure that critical project documents are put into fireproof files and that the <br /> safes are securely closed and locked. <br /> • Disconnect all computers and office equipment from the electrical outlets. <br /> e. After the storm <br /> 1) The contractor's/sub-contractor's call-in team: <br /> • Will evaluate the damage and initiate corrective action to ensure a safe <br /> site before employees are called back to work. <br /> • Move cautiously about the project,being on the alert for unsafe <br /> conditions left by the storm. <br /> • Survey the project for damage. <br /> 2) All personnel shall: <br /> • Stay tuned to local radio to find out when it is advisable to venture <br /> back out onto the public roadways. <br /> 1350 NE 56TH Street Suite 100 I Fort Lauderdale,Florida 33334 I t:(954)524 2575 I f:(954)524 2576 <br />
The URL can be used to link to this page
Your browser does not support the video tag.