Laserfiche WebLink
Time for Completion means the date of Substantial Completion as specified in the Contract <br />Documents. <br />Final Completion means the date certified by the City Engineer that all documents required <br />by the Contract Documents have been received by the City Engineer; any other documents <br />required to be provided by Contractor have been received by City Engineer; and to the best <br />of City Engineer's knowledge, information and belief the Work defined herein has been fully <br />completed in accordance with the terms and conditions of the Contract Documents. <br />Work as used herein refers to all services required by the Contract Documents, including all <br />labor, materials, equipment, supervision and services needed to complete the Project in <br />accordance with the Contract Documents. <br />ARTICLE 1. SCOPE OF WORK <br />Contractor shall provide all labor, materials, equipment, tools, manpower, management, <br />supervision, and all other necessary goods and services to perform the Work in the manner <br />provided by this Agreement and the Contract Documents. <br />ARTICLE 2. CONTRACT TIME, TIME FOR COMPLETION AND LIQUIDATED <br />DAMAGES <br />2.1 Time is of the essence in the performance of the Work under this Agreement. The <br />Commencement Date shall be no later than five (5) days after City's issuance of the Notice to <br />Proceed. Contractor shall perform the Work in accordance with the Contract Documents and <br />shall achieve Substantial Completion of the Project no later than ninety (90) calendar days from <br />the issuance of building permit. Thereafter, Contractor shall be required to obtain Final <br />Completion of the Project no later than thirty (30) calendar days from the date of the City's <br />Punch List. <br />2.2 Contractor shall complete all applications for the Permits, and submit all required <br />documents, including but not limited to the Bonds and the Insurance Certificate, within ten (10) <br />calendar days after issuance of a Notice to Proceed by the City. In the event Contractor fails to <br />deliver to the City the required documents within ten (10) days after issuance of a Notice to <br />Proceed, or fails to apply for the Permits within ten (10) days after issuance of a Notice to <br />Proceed, or fails to commence the Work within five (5) days after issuance of a Notice to <br />Proceed, then Contractor shall be in default. In such event the City, in addition to all remedies <br />provided for an event of Contractor's default hereunder, shall have the right to collect from <br />Contractor all expenses incurred by the City in the re- procurement of the Services. <br />2.3 Time is of the essence throughout this Agreement. <br />2.4 Upon failure of Contractor to achieve Substantial Completion of the Work by the Time <br />for Completion, plus approved time extensions (if applicable), Contractor shall pay to the City <br />the sum of Four Hundred Dollars ($400.00) for each calendar day after the Time for <br />4 <br />