Laserfiche WebLink
• <br /> • Format.This information will be provided as a PowerPoint presentation or different agreed upon <br /> medium that adequately details the results of the analysis. A report will not be provided. <br /> • Sharing. The firm and American Flood Coalition will have the ability to share the deliverable. The <br /> deliverable will be the version approved by the Municipality. <br /> • Testimonial. The Municipality, as appropriate,will be provided with the opportunity to share their <br /> experience, results, and outcomes in written or video format that can be used by all parties, <br /> including the firm. <br /> Timelines and touchpoints <br /> • 6-8 week project duration. Expected project timeline is 6-8 weeks once data has been received <br /> by the Firm, but may adjust based on data availability and responsiveness of the Municipality. <br /> • Project kickoff meeting. Within 3 weeks of signing the MOU for the assessment, the project will <br /> begin with a kickoff meeting. This kickoff will include key stakeholders and senior decision makers <br /> from the Municipality (i.e., Manager, Mayor, and others as needed). This kickoff will also include <br /> the project leads from the Firm and the contact from the American Flood Coalition. During the <br /> kickoff week, slightly greater time from municipal staff(-8 hours)will be needed. <br /> • Average of 3-4 hours of Municipal staff time per week.While the pilot process is largely <br /> conducted by the Firm, an average of 3-4 hours of time per week will be required by the Municipal <br /> representative. Greater time investment will be required during the kickoff, at the midpoint when <br /> adaptation measures are selected, and at the end as the deliverable is finalized. <br /> • Bi-weekly status calls.A bi-weekly status call will be scheduled at the outset of the project and <br /> will continue throughout the project. The selected representative from the American Flood <br /> Coalition and Municipality will be present on the call, along with appropriate staff for both parties, <br /> and the firm performing the analysis, if needed. <br /> Cost <br /> The Flood Adaptation Assessment will be provided to the Municipality at no cost. <br /> Other Considerations <br /> This MOU and project, in no way, precludes the municipality from working with either the Firm or <br /> American Flood Coalition on any other project or activity. <br /> Duration of MOU <br /> This MOU is at-will and may be modified by mutual consent of authorized officials from the American <br /> Flood Coalition and the Municipality. This MOU shall become effective upon signature by the authorized <br /> officials from the American Flood Coalition and the Municipality and will remain in effect until modified or <br /> terminated by any one of the partners by mutual consent. In the absence of mutual agreement by the <br /> authorized officials from American Flood Coalition and the Municipality this MOU shall end on September <br /> 30, 2019. <br /> Disclaimer of Liability <br /> All parties (American Flood Coalition, City of Sunny Isles Beach, and Atkins) specifically DISCLAIM <br /> LIABILITY FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES and assume no responsibility or liability <br /> for any loss or damage suffered by any person as a result of the use or misuse of any of the information <br /> or content provided under this Memorandum of Understanding and its deliverables. <br />