My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ 20-07-01 Continuing Professional Consulting Services (CCNA)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
RFQ 20-07-01 Continuing Professional Consulting Services (CCNA)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 2:56:56 PM
Creation date
7/23/2020 2:56:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 12 <br /> <br /> <br />• State of Florida Professional Engineer’s license <br />• State of Florida Architect’s license <br />• State of Florida Registered Landscape Architect license <br />• Certification from the American Institute of Certified Planners (AICP). <br />• At a minimum, Respondents must have at least one (1) team member accredited <br />in the United States Green Building Council Leadership in Energy and <br />Environmental Design (LEED). <br />• Testing laboratories must be certified by the Construction Materials Engineering <br />Council (CMEC) and adhere to the American Concrete Institute (ACI) and the <br />American Society for Testing and Material (ASTM) specifications. <br />• The successful firms must be properly registered and in compliance with the <br />State of Florida in addition to being licensed and registered with the Department <br />of Business and Professional Regulation to practice their profession in the State of <br />Florida. <br /> <br />2.7 PERFORMANCE AND PAYMENT BOND <br /> <br />Intentionally Omitted <br /> <br />2.8 BID BOND <br />Intentionally Omitted <br /> <br />2.9 DELIVERY <br /> <br />Intentionally Omitted <br /> <br />2.10 INSURANCE <br /> <br />Upon City’s notification, the Firm shall furnish to the City, Certificates of Insurance that <br />indicate that insurance coverage has been obtained, which meet the requirements as <br />outlined below: <br /> <br />2.10.1 Comprehensive General Liability Insurance <br /> <br />Contractor shall be required to purchase, maintain, and keep in full force, effect, <br />and good standing, Comprehensive General Liability with primary limits of One <br />Million Dollars ($1,000,000) per occurrence and Two Million Dollars ($2,000,000) <br />aggregate during the initial and any renewal term of this Agreement. Coverage
The URL can be used to link to this page
Your browser does not support the video tag.