Laserfiche WebLink
Project Approach <br />05 - Construction - The Physical <br />Realization of Your Vision <br />Perkins and Will is keenly aware of <br />the critical nature of construction <br />schedules and the potential <br />impact that results when deadlines <br />are altered. The construction <br />administration phase is given our full <br />attention to ensure that the projects <br />are completed expeditiously and in the <br />manner intended. <br />We provide administration of the <br />construction contract including: <br />• Advising and consulting with the <br />development administrative team <br />• Meeting with governing agencies <br />• Forwarding all owner instructions <br />to the contractor <br />• Review of shop drawings, samples, <br />and other contractor submissions <br />• Contract interpretation <br />• Issuing certificates of <br />payment and certificates of <br />substantial completion <br />• Preparing and issuing <br />change orders <br />On-site observation is provided <br />throughout this phase as merited by <br />the progress of the construction. The <br />on-site Architect will prepare Field <br />Observation Reports for distribution to <br />the contractor/construction manager <br />and owner that enumerate our <br />findings relative to the conformance <br />of the work with the requirements of <br />the contract documents. Deviations <br />are noted and necessary solutions <br />solicited from the contractor. <br />Post-Construction <br />Perkins and Will believes the success <br />of the construction phase extends into <br />successful occupancy and utilization. <br />We are committed to ensuring a <br />smooth transition of the various <br />projects to the City and its users. <br />We assist the City in any construction <br />issues in need of resolution. We <br />provide a thorough evaluation of the <br />operation and maintenance manuals. <br />If the facility includes any special <br />design features, such as a daylighting <br />and switching system, our team makes <br />a presentation to the staff to ensure <br />proper use. <br />The Physical Realization <br />of Your Vision <br />Project Approach <br />17 <br />RFQ 20-07-01 / Continuing Professional Consulting Services (CCNA)