Laserfiche WebLink
R. Wyatt Altman, PSM, cont’d. Resume <br />Maser Consulting <br />Unmanned Aerial System, Terrestrial LiDAR and Imagery Mapping for the Great Falls-Dearborn Headworks <br />Spillway and Great Falls Diversion Dam <br />Cedar Falls, Greenville County, SC <br />Using our Pulse Aerospace Vapor 55 drone, together with a Riegl VUX LiDAR sensor and a mix of digital imagery <br />sensors, Maser Consulting provided UAS LiDAR mapping, a digital ortho-rectified image, oblique imagery, video & <br />CAD mapping files in support of the Great Falls-Dearborn Headworks Spillway and Great Falls Diversion Dam. <br /> <br />Standard Pacific Homes - Meadow Pointe IV <br />Wesley Chapel, Pasco County, FL <br />Provided survey services for the construction of Meadow Pointe IV, a planned community built by CalAtlantic Homes <br />(formerly Standard Pacific Homes). The 138-acre site houses 117 homes, six ponds, and a park. Services included <br />construction staking services for the initial land development of the planned community, as well as staking for the <br />ponds, lots, roads, walls, and all utilities for Phase 1 of the project. Provided staking for the walls and pond in Phase <br />2, along with mass grading of the street and lots. <br /> <br />All Aboard Florida Rail Project SR 528 Corridor Survey <br />City of Orlando, Orange County, FL <br />Survey Crew Chief providing Mobile LiDAR services and post-processed and delivered data in support of AMEC <br />Foster Wheeler and HNTB for design survey services for the planned All Aboard Florida Rail project, which spans <br />the state of Florida from Miami to Orlando. Tasks included utilizing Mobile LiDAR to capture 3D point cloud <br />information along a seven-mile stretch of SR 528 for the proposed rail design. Using this technology allowed rapid <br />collection of survey information and reduced safety risks for technical staff and the public. 3D extraction of features <br />and creation of FDOT compliant deliverables were also performed for this project. <br /> <br />SR 54 Design Build Survey Services, FDOT District 7 <br />Pasco County, FL <br />Survey Crew Chief providing Mobile LiDAR services and post-processed and delivered data for this design-build <br />contract, which consisted of road widening, sidewalk design, and signal redesign for seven miles of SR 54. <br />Responsibilities included utilizing Mobile LiDAR, Static LiDAR, and Aerial LiDAR to create standard FDOT compliant <br />deliverables. TopoDOT was used to extract 3D break lines, features, and ground points for creation of a detailed <br />DTM and standard 2 planimetric files. This information was also combined with conventional boots on the ground <br />survey data and existing information provided by the FDOT from earlier surveys in order to completely cover the <br />corridor width. This investigation found about 70% of the corridor needed to be resurveyed, a process that was <br />completed in a timely matter by leveraging the LiDAR technology. <br /> <br />Topographic Surveying for Duval-Kingsland 230 KV Line R/W, NW <br />City of Jacksonville, Duvall County, FL <br />Utilizing RTK GPS to establish control for the traverse along the transmission line for a corridor survey along an <br />existing power line easement, with the purpose of locating the transmission line and redefining the easement for <br />Florida Power & Light. Due to the speed of the robotic total station, the 20-mile transmission line was traversed in <br />two weeks along with the location of property corners, transmission line towers, guy anchors, fences, crossing <br />roads, and sections corners. Using a laptop, was able to process the field work each night. The laptop and WIFI <br />mobile hotspot proved to be invaluable when searching for section corners away from the transmission line and <br />with internet access researched the section corners in real time from the survey truck. Upon completion of the field <br />work and with documentation from the client, the project surveyor was able to determine the proper location of the <br />easement. Then with the speed of the robotic total station, set approx. 42 concrete monuments in four work days. <br /> <br />Surveying Services for I-275-SR 60 Interchange, FDOT District 7 <br />City of Tampa, Hillsborough County, FL <br />Involved in this project from site planning, HDS efforts and data processing, to deliverable creation. Responsible <br />for the processing of control traverses using StartNet least squares adjustments, conventional topographic data, <br />vertical level loops and HDS data extraction out of point clouds using TopoDOT. Project entailed the development <br />of detailed topographic and elevation data for numerous areas along the Interstate 275/State Road 60 interchange <br />in Tampa, FL. Working directly with FDOT District 7, developed a field plan to utilize High Definition Surveying <br />(HDS) and integrated RTK GPS/robotic total station survey techniques. <br />Section F, Page 21