Laserfiche WebLink
E-71Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />The City of Fort Lauderdale, in an effort to provide its residents <br />with the most up-to-date water, sewer, and drainage <br />services, developed a long-term capital improvements <br />project that improved the city’s infrastructure. The City <br />invested over $550M towards these improvements, the <br />majority of which were completed in 2011. CES was part of <br />the engineering team for WaterWorks 2011, providing critical <br />Owner’s Representative, Engineering, and Construction <br />Services to the City to ensure compliance with the City’s <br />robust infrastructure improvement plan. CES staff worked <br />on a full-time basis, observing several work crews in various stages of completion and drafting <br />daily reports that the client used towards payment requisition verification, schedule compliance, <br />work site safety, and verification of construction adherence to design specifications. Since <br />these reports were developed and submitted on a daily basis, the client was able to adhere <br />to the project schedule without incurring delays, and was able to make corrections as needed. <br />Construction activities observed by CES staff included the following: <br />The WaterWorks 2011 projects focused on water and sewer improvements in twenty neighborhood <br />communities, including approximately 50 miles of new gravity sewer, 19 new lift stations, 19 <br />miles of new water main, and five miles of new force main. The projects included conventional <br />open-cut construction and trenchless technologies such as jack and bore and directional drill. <br />Various projects in the program included: <br />Cost <br />$200M <br />Completed within <br />Budget & schedule <br />Yes <br />Key Features <br />Construction Engineering & <br />Inspection Services (CEI) <br />$550M Overall Program <br />Owner’s Representative, <br />Engineering & Construction <br />Services <br />Water Main <br />Sanitary Sewer Force Main <br />Sanitary Gravity Sewer <br />Lift/Pump Station Upgrades <br />Drainage <br />Swale Reconstruction <br />Roadway Reconstruction <br />Sidewalk Reconstruction <br />Open-cut Construction <br />Jack & Bore <br />Horizontal Directional Drill <br />25. Firms from section involved with this project <br />A. <br />(1) FIRM NAME (2) FIRM LOCATION (City & State) (3) ROLE <br />CES Consultants, Inc.Miami, Pembroke Pines & <br />West Palm Beach, FL <br />Civil Engineering, Utilities & Drainage, <br />Construction Services & Inspections <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />F. Example projects which best illustrate proposed team’s qualifications for this contract <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />18 <br />21. TITLE AND LOCATION (City and State) <br />Fort Lauderdale WaterWorks 2011 Program, Fort Lauderdale, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2012 2012 <br />23. PROJECT OWNER’S INFORMATION <br />A. PROJECT OWNER B. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER <br />City of Ft. Lauderdale/ CMTS Yvonne McClain 904.739.9804 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> »Water Main Installation <br /> »Sanitary Sewer Force Main Installations <br /> »Sanitary Gravity Sewer Installation <br /> »Pump Station Upgrades and Installation <br /> »Drainage Installation <br /> »Swale Reconstruction <br /> »Roadway Reconstruction <br /> »Sidewalk Reconstruction <br /> »Lauderdale West & Sunset North Communities (Septic Area 3) <br /> »Shady Banks (Septic Area 5) <br /> »River Run, Flamingo Park and Oak River (Septic Area 4) <br /> »Edgewood (Septic Area 8) <br /> »River Lands & Woodlands Communities (Septic Area 2) <br /> »Chula Vista (Septic Area 19) <br /> »Dorsey Riverbend / Washington Park (Septic Area 18) <br /> »Miami Road Sanitary Sewer Improvements <br /> »Sunrise Key/Sunrise Intracoastal Water Main Improvements <br /> »Oakland Park Large Water Main <br /> »NE Large 12-inch Water Main Improvements <br /> »48-inch Water Main Improvements <br /> »Imperial Point Water Main Improvements <br /> »Harbor Beach Inspection Services <br /> »Phase I System Wide Pump Station Upgrade Inspection <br />Services <br /> »Group V Pump Station Inspection Services <br /> »Pump Station Lauderdale Manors / Melrose Inspection Services <br /> »East Las Olas Isles / Seven Isles Utility Improvements Inspection <br />Services