My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction Engineering & Inspection (CEI) Svcs
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Construction Engineering & Inspection (CEI) Svcs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:15:47 AM
Creation date
8/21/2020 10:14:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E-72Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />CES was part of the Program Management team that administered and oversaw the Ft. <br />Lauderdale International Airport Master Plan, including the design and construction of the <br />five-gate Concourse A facility in Terminal 1, which included a Federal Inspection Services (FIS) <br />facility, other terminal building improvements, and enabling projects. As part of the Program <br />Management team, CES assisted in defining and establishing a three-year Progra m and a <br />QA/QC Oversight Plan consistent with BCAD’s requirements. CES also provided Construction <br />Coordination, Inspections and Audits; Cost and Change Management; QA/QC Review; Web <br />Based Project Management; System Oversight; Program Specifications; and Information <br />Technology Project Management services. Construction Engineering Inspection (CEI) and Audit <br />services were provided for Vertical Construction, Roadways, Site Development, Utilities (Water <br />& Wastewater Systems), and Stormwater/Drainage Infrastructure. <br />Specialized Services Included: <br /> »Programmed the sequence of projects, project scope verification, project design <br />development, development and management of the CIP master schedule, task schedules, <br />and budget/cost oversight of project elements; <br /> »Project management, tracking and reporting of contracts and projects status; daily <br />inspections and logs; and document daily progress and quality of construction work; <br /> »Provided strategic day-to-day oversight and direction for the CIP and specific projects; <br /> »Identified projects and propose mitigation and solutions; <br /> »Prepared and maintained a Program QA/QC Plan; <br /> »Provided cost estimates and schedule of values; <br /> »Assisted with developing contract language and contract negotiations; <br /> »Assisted with plan review function and any Interagency Memorandums of Understanding; <br />Cost <br />$333M <br />Completed within <br />Budget & schedule <br />Yes <br />Key Features <br />Construction Engineering & <br />Inspection Services (CEI) <br />Construction Coordination <br />Cost & Change Management <br />Quality Assurance/Quality <br />Control <br />Project Management <br />Capital Planning <br />Asset Management Plan <br />Development <br />Transportation/Roadway <br />Construction <br />Site Development <br />Water and Wastewater Systems <br />Infrastructure <br />Stormwater and Surface <br />Water Management System <br />Infrastructure <br />Web Based Project <br />Management <br />System Oversight <br />Standard Program <br />Specifications <br />Design Management Oversight <br />Information Technology Project <br />Management <br />F. Example projects which best illustrate proposed team’s qualifications for this contract <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />19 <br />21. TITLE AND LOCATION (City and State) <br />FLL Southwest Airlines Terminal 1 Modernization Program <br />Management, Ft. Lauderdale-Hollywood International Airport, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2011 2017 <br />23. PROJECT OWNER’S INFORMATION <br />A. PROJECT OWNER B. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER <br />BCAD/Southwest Airlines/Parsons Jeffrey Kyser 305.219.1045 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
The URL can be used to link to this page
Your browser does not support the video tag.