My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction Engineering & Inspection (CEI) Svcs
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Construction Engineering & Inspection (CEI) Svcs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:15:47 AM
Creation date
8/21/2020 10:14:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proven solutionsResponsive and dependable performance <br />City of St. Petersburg RFQ 7716: Consulting Services for Potable Water, Wastewater & Reclaimed Water Projects <br />E-77 <br />G. key personnel participation in example projects <br />26. NAMES OF KEY PERSONNEL <br />(From Section E, Block 12) <br />27. ROLE IN THIS CONTRACT <br />(From Section E, Block 13) <br />28. EXAMPLE PROJECTS LISTED IN SECTION F <br />(Fill in “Example Projects Key” section below before completing table, Place “X” under project key number for participation in same or similar role.) <br />1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 <br />Rudy Ortiz, PE, CGC Principal-in-Charge ✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓ <br />Jose Caraballo, PE Vice President; Project Manager ✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓ <br />Gustavo Silva, PE Associate; Assistant Project Manager ✓✓✓✓✓✓✓✓✓✓✓ <br />Blake Guillory, PE, D.WRE President; Principal-in-Charge & Technical Advisor ✓✓✓✓✓✓✓ <br />David Hoot, PE Vice President; Sr. Project Manager ✓✓✓✓✓✓✓✓ <br />Jafet Torres, PE Project Engineer & Designer; Hydraulic Modeler; GIS ✓✓✓✓✓✓✓✓ <br />Amanda Guillory, PE, ENV SP Project Engineer & Designer; Hydraulic Modeler; GIS ✓✓✓✓✓✓ <br />Simon Sainsbury, PhD Cand., PE Electrical Engineering, I&C & SCADA ✓✓✓✓✓✓ <br />Jose Martinez, PE Structural Engineer ✓✓✓ <br />Erik Alcantara, EI, ENV SP Project Engineer & Designer ✓✓✓✓✓✓✓✓✓✓✓ <br />Deavon Uter, PE Project Engineer & Designer ✓✓✓ <br />Bishow N. Shaha, EI Project Engineer & Designer ✓✓✓ <br />Bud Goblisch, PE Vice President; Sr. Construction Manager & CEI ✓✓ <br />Ernest Cano Sr. Construction Manager & CEI ✓ <br />Ashraf Iqbal, EI Project Engineer, Designer, CA & CEI Inspector ✓✓✓✓✓✓✓✓✓✓✓ <br />Jose “Rafa” Castro, EI, ENV SP Project Engineer, Designer, CA & CEI Inspector ✓✓✓ <br />Harry Price Construction Administration & CEI Inspector ✓✓✓ <br />Jocelyn Roman Staff Engineer/CADD ✓✓✓ <br />Eva Cordova Staff Engineer/CADD ✓✓✓✓✓✓ <br />Eduardo Suarez, PSM Survey & Mapping ✓✓✓ <br />John H. Adler, III, PSM Survey & Mapping ✓✓✓ <br />Alejandro R. Montenegro, PE Geotechnical & Environmental Engineering, & Testing Lab <br />29. EXAMPLE PROJECTS KEY <br />NO.TITLE OF EXAMPLE PROJECT (From Section F)NO.TITLE OF EXAMPLE PROJECT (From Section F)NO.TITLE OF EXAMPLE PROJECT (From Section F)NO.TITLE OF EXAMPLE PROJECT (From Section F) <br />1 West Avenue North & South D/B Neighborhood Utility & Resiliency <br />Improvements 6 Miramar Infrastructure Improvements & Service Conversions, <br />Phase III 11 South Florida Waste Management District Continuing <br />Service Contract 16 BCWWS Master Pump Station 450 Improvements <br />2 D/B Water Main Replacement & Service Conversions in the <br />Shenandoah Area, Phase B 7 NW 12th Avenue Force Main Design 12 MDWASD South District Wastewater Treatment Plant <br />High-Level Disinfection Upgrades 17 Marlins Ballpark <br />3 D/B Replacement of Water Main & Service Conversions in “Donut <br />Hole” Area 8 MDWASD Pump Station Improvement Program (Phase II) & <br />Associated Force Mains 13 MIA POJV North Terminal Development Project 18 Fort Lauderdale WaterWorks 2011 Program <br />4 City of Miami Beach Engineering Services for Water & Wastewater <br />System Projects 9 MDWASD Engineering, Design and Related Services for the <br />Local Pump Station Improvement Program 14 FLL CPM for Expansion of Runway 9R-27L 19 FLL Southwest Airlines Terminal 1 Modernization Program <br />Management <br />5 Pembroke Pines Continuing Service Contract 10 SW 27th Ave. Drainage Improvements, Roadway <br />Reconstruction & Widening 15 East Miramar Infrastructure Improvements, Phase I 20 Gilbert Samson Oceanfront Park <br />21 Pump Station 0301 Sunny Isles Boulevard <br />22 Gateway Park <br />STANDARD FORM 330 (REV. 8/2016) PAGE 4
The URL can be used to link to this page
Your browser does not support the video tag.