My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction Engineering & Inspection (CEI) Svcs
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Construction Engineering & Inspection (CEI) Svcs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:15:47 AM
Creation date
8/21/2020 10:14:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E-78Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />H. ADDITIONAL INFORMATION <br />30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. <br />Additional References & Past <br />Performance Evaluations <br />CES has an excellent past performance history with municipal, <br />county and governmental agency clients. Please see the <br />reference letters and evaluations included herein. <br />. <br /> <br /> <br /> <br /> <br /> <br /> <br />RAFAEL J. BALLE <br />S <br />T <br />E <br />R <br />O <br />S <br /> <br />P <br />. <br />E <br />. <br />, <br /> <br />P <br />. <br />A <br />. <br /> <br />CONSULTANTS, E <br />N <br />G <br />I <br />N <br />E <br />E <br />R <br />S <br /> <br />& <br /> <br />P <br />L <br />A <br />N <br />N <br />E <br />R <br />S <br /> <br />Bus: 305 -823 -7343 Cell: 305 -753 -2605 <br />E -mail: Rafaeljuanb@aol.com <br /> <br /> <br /> Ref; CES Consultants, In <br />c <br />. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> To Whom It May Concern <br />: <br /> <br /> <br /> Key team members of the <br /> <br />C <br />E <br />S <br /> <br />t <br />e <br />a <br />m <br /> <br />h <br />a <br />v <br />e <br /> <br />a <br /> <br />l <br />o <br />n <br />g <br /> <br />s <br />t <br />a <br />n <br />d <br />i <br />n <br />g <br /> <br />a <br />n <br />d <br /> <br />e <br />s <br />t <br />a <br />b <br />l <br />i <br />s <br />h <br />e <br />d <br /> <br />relationship working with <br /> <br />t <br />h <br />e <br /> <br />Miami -Dade Water and Sewer D <br />e <br />p <br />a <br />r <br />t <br />m <br />e <br />n <br />t <br />. <br /> One of my duties on Miam <br />i <br /> <br />D <br />a <br />d <br />e <br /> <br />W <br />a <br />t <br />e <br />r <br /> <br />a <br />n <br />d <br /> <br />S <br />e <br />w <br />e <br />r <br /> <br />D <br />e <br />p <br />a <br />r <br />t <br />m <br />e <br />n <br />t <br /> <br />w <br />a <br />s <br /> <br />P <br />r <br />o <br />j <br />e <br />c <br />t <br /> <br />M <br />a <br />n <br />a <br />g <br />e <br />r <br /> <br />of the Need Assessment <br />P <br />r <br />o <br />g <br />r <br />a <br />m <br /> <br />( <br />N <br />A <br />P <br />) <br /> <br />and General Obligation B <br />o <br />n <br />d <br /> <br />( <br />G <br />O <br />B <br />) <br />. <br /> <br /> <br /> The scope of work consis <br />t <br />s <br /> <br />i <br />n <br />; <br /> <br /> <br /> Prepare Basis of Design <br />R <br />e <br />p <br />o <br />r <br />t <br /> <br />w <br />h <br />i <br />c <br />h <br /> will include an overview o <br />f <br /> <br />t <br />h <br />e <br /> <br />e <br />x <br />i <br />s <br />t <br />i <br />n <br />g <br /> <br />facilities, recommendatio <br />n <br />s <br /> <br />f <br />o <br />r <br /> <br />i <br />m <br />p <br />r <br />o <br />v <br />e <br />m <br />e <br />n <br />t <br />s <br />, <br /> <br />l <br />i <br />s <br />t <br /> <br />o <br />f <br /> <br />p <br />e <br />r <br />m <br />i <br />t <br />s <br /> <br />a <br />n <br />d <br /> <br />a <br />p <br />p <br />r <br />o <br />v <br />a <br />l <br />s <br /> <br />required for permitting ag <br />e <br />n <br />c <br />i <br />e <br />s <br /> <br />a <br />n <br />d <br /> <br />a <br /> <br />s <br />c <br />h <br />e <br />d <br />u <br />l <br />e <br /> <br />f <br />o <br />r <br /> <br />c <br />o <br />m <br />p <br />l <br />e <br />t <br />i <br />n <br />g <br /> <br />p <br />r <br />o <br />j <br />e <br />c <br />t <br /> <br />t <br />a <br />s <br />k <br />s <br /> <br />o <br />f <br /> <br />project. <br /> Prepare design plans and <br /> <br />C <br />o <br />n <br />s <br />t <br />r <br />u <br />c <br />t <br />i <br />o <br />n <br /> <br />B <br />i <br />d <br /> <br />D <br />o <br />c <br />u <br />m <br />e <br />nts according to the <br />MDWASD and Dade Coun <br />t <br />y <br /> <br />r <br />u <br />l <br />e <br />s <br />, <br /> <br />r <br />e <br />g <br />u <br />l <br />a <br />t <br />i <br />o <br />n <br />s <br /> <br />a <br />n <br />d <br /> <br />r <br />e <br />q <br />u <br />i <br />r <br />e <br />m <br />e <br />n <br />t <br />s <br /> <br />o <br />f <br /> <br />t <br />h <br />e <br /> <br />permitting agencies with <br />j <br />u <br />r <br />i <br />s <br />d <br />i <br />c <br />t <br />i <br />o <br />n <br /> <br />o <br />v <br />e <br />r <br /> <br />t <br />h <br />e <br /> <br />p <br />r <br />o <br />j <br />e <br />c <br />t <br />. <br /> <br /> <br /> Provide construction adm <br />i <br />n <br />i <br />s <br />t <br />r <br />a <br />t <br />i <br />o <br />n <br /> <br />s <br />e <br />r <br />v <br />i <br />c <br />e <br />s <br /> <br />f <br />o <br />r <br /> <br />t <br />h <br />e <br /> <br />p <br />r <br />o <br />j <br />e <br />c <br />t <br /> <br />l <br />i <br />m <br />i <br />t <br />e <br />d <br /> <br />t <br />o <br /> <br />a <br />t <br />t <br />e <br />n <br />d <br />i <br />n <br />g <br /> <br />pre -bid, pre -clarification and pre -construction meeting with <br /> <br />W <br />A <br />S <br />D <br /> <br />f <br />o <br />r <br />c <br />e <br />s <br />, <br /> <br />review shop drawings, he <br />l <br />p <br /> <br />t <br />h <br />e <br /> <br />P <br />M <br /> <br />a <br />n <br />d <br />/ <br />o <br />r <br /> <br />W <br />A <br />S <br />D <br /> <br />a <br />n <br />s <br />w <br />e <br />r <br />i <br />n <br />g <br /> <br />R <br />F <br />I <br />’ <br />s <br /> <br />a <br />n <br />d <br /> <br />change order request. <br /> The CES design team wa <br />s <br /> <br />a <br />l <br />w <br />a <br />y <br />s <br /> <br />v <br />i <br />g <br />i <br />l <br />a <br />n <br />t <br /> <br />i <br />n <br /> <br />m <br />e <br />e <br />t <br />i <br />n <br />g <br /> <br />o <br />u <br />r <br /> <br />r <br />e <br />q <br />u <br />e <br />s <br />t <br />s <br /> <br />t <br />h <br />r <br />o <br />u <br />g <br />h <br />o <br />u <br />t <br /> <br />e <br />v <br />e <br />r <br />y <br /> <br />phase of WASD projects. <br /> <br /> <br /> On behalf of my experience with CES, I w <br />i <br />l <br />l <br /> <br />l <br />i <br />k <br />e <br /> <br />t <br />o <br /> <br />n <br />o <br />t <br />e <br /> <br />t <br />h <br />e <br /> <br />e <br />x <br />p <br />e <br />r <br />t <br />i <br />s <br />e <br /> <br />l <br />e <br />v <br />e <br />l <br /> <br />e <br />x <br />h <br />i <br />b <br />i <br />t <br />e <br />d <br /> <br />by CES. I am pleased to <br />r <br />e <br />c <br />o <br />m <br />m <br />e <br />n <br />d <br /> <br />C <br />E <br />S <br /> <br />f <br />o <br />r <br /> <br />a <br />d <br />d <br />i <br />t <br />i <br />o <br />n <br />a <br />l <br /> <br />d <br />e <br />s <br />i <br />g <br />n <br />, <br /> <br />c <br />o <br />n <br />s <br />t <br />r <br />u <br />c <br />t <br />i <br />o <br />n <br /> <br />management and inspect <br />i <br />o <br />n <br /> <br />s <br />e <br />r <br />v <br />i <br />c <br />e <br />s <br /> <br />p <br />r <br />o <br />j <br />e <br />c <br />t <br /> <br />r <br />e <br />l <br />a <br />t <br />e <br />d <br /> <br />w <br />o <br />r <br />k <br />. <br /> <br /> <br /> <br />I recently retired from Mi <br />a <br />m <br />i <br /> <br />D <br />a <br />d <br />e <br /> <br />W <br />a <br />t <br />e <br />r <br /> <br />a <br />n <br />d <br /> <br />S <br />e <br />w <br />e <br />r <br /> <br />Department. Please feel f <br />r <br />e <br />e <br /> <br />t <br />o <br /> <br />contact me for any additi <br />o <br />n <br />a <br />l <br /> <br />i <br />n <br />f <br />o <br />r <br />m <br />a <br />t <br />i <br />o <br />n <br />. <br /> <br /> <br /> <br /> Sincerely <br /> Rafael J. Ballesteros, P.E <br />. <br /> <br /> <br /> <br />““The CES design team was <br />always vigilant in meeting our <br />requests throughout every phase <br />of WASD projects. On behalf <br />of my experience with CES, I <br />will like to note the expertise <br />level exhibited by CES. I am <br />pleased to recommend CES for <br />additional design, construction <br />management and inspection <br />services project related work. <br />Rafael J. Ballesteros, PE <br />Miami-Dade Water and Sewer Department <br />Need Assessment Program (NAP) & <br />General Obligation Bond (GOB) Program
The URL can be used to link to this page
Your browser does not support the video tag.