Laserfiche WebLink
F-2Proven solutions <br />Responsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />and programs provides us with the required expertise to <br />successfully work in residential neighborhoods, on local and <br />commuter roadways, and near schools, along with the know- <br />how to solve the unique challenges each can present. <br />To efficiently serve the City throughout this contract, CES has <br />identified key professional individuals for each of the required <br />technical disciplines and specialties to assure the City of the <br />availability of quality design/construction staff and of our <br />ability to provide a prompt response to any requested services. <br />CES has assembled a “deep bench” and an experienced team <br />of qualified professionals—a team with strong technical <br />expertise and knowledge. The following is a brief synopsis of <br />the CES Team’s areas of responsibility. <br />Key Personnel <br />The right people make the difference; they are critical to the <br />success of any project. As your consultant, the CES team will <br />provide the City with the knowledge and expertise necessary <br />to complete your projects on time and on budget. CES has <br />more than enough capacity and highly-qualified, available <br />personnel to provide the required services in the City’s <br />required timeframe. <br />The CES team brings nearly 20 years of Civil Engineering and <br />Construction Engineering and Inspection (CEI) experience to <br />the City, having worked alongside a variety of similar clients <br />and stakeholders, effectively applying professional and <br />technical expertise to plan and control resources, schedule <br />and risk to assure the successful delivery of quality, functional <br />projects on time and within budget. Our team’s Key Personnel <br />include: <br />Rudy Ortiz, PE, CGC, Principal- <br />in-Charge, has over 30 years of <br />construction management, program <br />management, and engineering <br />design experience in a variety of civil <br />infrastructure projects, specializing <br />in the design and construction of <br />water/wastewater utilities, stormwater and drainage projects, <br />neighborhood improvement projects, transportation facilities <br />and roadways. His experience includes Program Management <br />of fast-track and complex water and wastewater projects, <br />including Consent Decree programs for Miami-Dade County <br />and Puerto Rico. With the City of New York, Rudy functioned as <br />Construction Manager, Resident Engineer and Field Engineer <br />for a variety of multi-million dollar roadway reconstruction <br />and neighborhood improvement projects. <br />Jose Caraballo, PE, Vice <br />President and Project Manager <br />for this contract, has 18 years of <br />professional experience in the <br />areas of civil, water, wastewater, <br />stormwater and drainage design, <br />transportation and environmental <br />engineering, including over 120,000 LF of residential water <br />main, 20,000 LF of water treatment plant yard piping, and <br />more than 50 pump/lift stations, and project management <br />with various public entities. He has been involved in a variety <br />of civil and environmental engineering projects related to the <br />improvement of roadways, public utilities, drainage systems, <br />pump stations, lift stations, water treatment plants, ports <br />and airports, Class IV Freshwater Wetland Permitting and <br />Environmental Resources Permitting, amongst others. Jose <br />has successfully overseen projects from the initial assessment, <br />feasibility analysis and conceptual stages through completion, <br />including full design, permitting, construction management/ <br />administration and close-out. Jose’s construction background <br />blended with his design acumen gives him a unique perspective <br />valuable to design build projects. <br />CES’s experience includes: <br />Over 400,000 LF of urban water main, <br />from 6” to 96” in all materials <br />Over 200,000 LF of gravity sewer <br /> Over 200,000 LF of force <br />mains, from 8” to 48” <br />Over 900 pump/lift stations