<br />12. NAME
<br />Patrick J. Gibney, P.E.
<br />13. ROLE IN THIS CONTRACT
<br />Client Contact/Project Manager - CEI
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />33
<br />b. WITH CURRENT
<br />FIRM
<br />27
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Rutgers, The State University, Bachelor of Science,
<br />Civil Engineering (1987)
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Engineer - Florida No. 49428 (1995)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />American Society of Civil Engineers, FDOT Pre-Qualified Roadway Construction Engineering Inspection
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />NE 38th Street Complete Streets Project
<br />Oakland Park, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2011
<br />CONSTRUCTION (If applicable)
<br />2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Gibney was project manager for this Complete Streets Project which involved providing surveying, civil
<br />engineering, and landscape architectural services for the design and permitting of approximately 0.90 miles of
<br />roadway improvements. Construction included a complete storm drainage system, a roundabout to replace an
<br />existing traffic signal, traffic calming devices, landscape and streetscape, utility coordination/relocations, &
<br />roadway reconstruction.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />North County Neighborhood Improvement Project, NE Quadrant
<br />Bid Package 11, Pompano Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2009 - 2011
<br />CONSTRUCTION (If applicable)
<br />2011 - 2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Gibney managed this project. NCNIP BP 11 included over 14,777 LF of storm sewer, 12,993 LF of
<br />exfiltration trench, 64,000 LF of water main, 553 water services 49,700 LF of reclaimed water main, 796
<br />reclaimed water services, 43,805 LF of gravity sewer main, 750 sewer laterals, lift station, and 1,630 LF of force
<br />main. Main line pipe sizes ranged from 4” to 48” in diameter. The project also included over 50,688 LF linear
<br />feet of new roadway construction, sidewalks, driveway aprons, and sodded swales.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Davie Road Phase 1 CEI Services
<br />Davie, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If applicable)
<br />2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager, CEI services -The length of the reconstruction was approximately 2,640 linear feet. The
<br />construction project consisted of pavement, base and sub-grade reconstruction, curb & gutter construction, bike
<br />lane construction, sidewalk construction, median construction, drivew ay reconstruction within the Right-of-way,
<br />drainage system construction, landscaping & irrigation construction, pavement marking & signage, traffic signal
<br />modification at Reese Road and at Nova Drive, street lighting, and coordination with utility companies.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Westside Drainage Infrastructure Improvements
<br />Davie, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager, CEI services -The new control structure was placed in the dry retention to limits the discharge
<br />to the canal and provides the required water quality for the Public Works Site, Covenant House Park Site, and
<br />the West Side. The North Side has its own dry retention area for water quality and control structure with a weir
<br />elevation of 3.10’ NAVD, prior to discharging to the main trunk line. The storm sewer was 3,225 linear feet, the
<br />exfiltration trench was 1,270 linear feet, the roadway, 6,100 linear feet and the sidewalk 2,300 linear feet.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miramar Historic Area Complete Streets Project – Phase II
<br />Miramar, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />2019
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager - The project includes surveying, landscape and engineering design, permitting and CEI for
<br />complete streets bounded by Pembroke Road to the north, County Line Road to the south, SW 62nd Avenue to
<br />the west, and SR 7 to the east. The project includes six (6) streets in the Historical Area. The improvements
<br />include: sidewalks, ADA ramps, crosswalks, pedestrian level lighting, landscaping and hardscape.
<br />E | Page 89
|