Laserfiche WebLink
<br /> STANDARD FORM 330 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Patrick J. Gibney, P.E. <br />13. ROLE IN THIS CONTRACT <br />Client Contact/Project Manager - CEI <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />33 <br />b. WITH CURRENT <br />FIRM <br />27 <br />15. FIRM NAME AND LOCATION (City and State) <br />Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Rutgers, The State University, Bachelor of Science, <br />Civil Engineering (1987) <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer - Florida No. 49428 (1995) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />American Society of Civil Engineers, FDOT Pre-Qualified Roadway Construction Engineering Inspection <br /> <br />19. RELEVANT PROJECTS <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />NE 38th Street Complete Streets Project <br />Oakland Park, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (If applicable) <br />2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Gibney was project manager for this Complete Streets Project which involved providing surveying, civil <br />engineering, and landscape architectural services for the design and permitting of approximately 0.90 miles of <br />roadway improvements. Construction included a complete storm drainage system, a roundabout to replace an <br />existing traffic signal, traffic calming devices, landscape and streetscape, utility coordination/relocations, & <br />roadway reconstruction. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />North County Neighborhood Improvement Project, NE Quadrant <br />Bid Package 11, Pompano Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2009 - 2011 <br />CONSTRUCTION (If applicable) <br />2011 - 2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Gibney managed this project. NCNIP BP 11 included over 14,777 LF of storm sewer, 12,993 LF of <br />exfiltration trench, 64,000 LF of water main, 553 water services 49,700 LF of reclaimed water main, 796 <br />reclaimed water services, 43,805 LF of gravity sewer main, 750 sewer laterals, lift station, and 1,630 LF of force <br />main. Main line pipe sizes ranged from 4” to 48” in diameter. The project also included over 50,688 LF linear <br />feet of new roadway construction, sidewalks, driveway aprons, and sodded swales. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Davie Road Phase 1 CEI Services <br />Davie, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager, CEI services -The length of the reconstruction was approximately 2,640 linear feet. The <br />construction project consisted of pavement, base and sub-grade reconstruction, curb & gutter construction, bike <br />lane construction, sidewalk construction, median construction, drivew ay reconstruction within the Right-of-way, <br />drainage system construction, landscaping & irrigation construction, pavement marking & signage, traffic signal <br />modification at Reese Road and at Nova Drive, street lighting, and coordination with utility companies. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Westside Drainage Infrastructure Improvements <br />Davie, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager, CEI services -The new control structure was placed in the dry retention to limits the discharge <br />to the canal and provides the required water quality for the Public Works Site, Covenant House Park Site, and <br />the West Side. The North Side has its own dry retention area for water quality and control structure with a weir <br />elevation of 3.10’ NAVD, prior to discharging to the main trunk line. The storm sewer was 3,225 linear feet, the <br />exfiltration trench was 1,270 linear feet, the roadway, 6,100 linear feet and the sidewalk 2,300 linear feet. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Miramar Historic Area Complete Streets Project – Phase II <br />Miramar, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />2019 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager - The project includes surveying, landscape and engineering design, permitting and CEI for <br />complete streets bounded by Pembroke Road to the north, County Line Road to the south, SW 62nd Avenue to <br />the west, and SR 7 to the east. The project includes six (6) streets in the Historical Area. The improvements <br />include: sidewalks, ADA ramps, crosswalks, pedestrian level lighting, landscaping and hardscape. <br />E | Page 89