|
<br /> STANDARD FORM 330
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />James A. Sheddy
<br />13. ROLE IN THIS CONTRACT
<br />Senior Construction Inspector
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />48
<br />b. WITH CURRENT FIRM
<br />15
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Broward Community College
<br />University of Florida
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br />
<br />
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Livable Neighborhood Improvements – Vista Verde – Phases 1D,
<br />2 & 3, Miami Gardens, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Sheddy provided construction inspection for the project. The Vista Verde Phase 1D, 2, 3 Improvements
<br />project is located within the City of Miami Gardens bordered by NW 213th Street to the north, NW 207th Lane to
<br />the south, NW 37th Avenue (Douglas Road) to the east, and a vacant plot of land to the west. This is a drainage
<br />improvements project for the City of Miami Gardens. Improvements included: 7,280 l inear feet of storm sewer,
<br />5,640 linear feet of exfiltration trench, 140 drainage structures, 30,050 SY of roadway milling & resurfacing, and
<br />29,900 SY of roadway reconstruction.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />NE 29th Place Roadway Improvements
<br />Aventura, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If applicable)
<br />2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Responsible for Inspection services for the milling and resurfacing of existing roadway, installation of curb and
<br />gutter, pavement marking, signage, and traffic signal loops drainage installation, cleaning and videoing of
<br />drainage system, sidewalk construction, tree removal and installation, and light pole modifications on NE 29th
<br />Place (North) from Aventura Boulevard to NE 203rd Street.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />N-29A Canal Connector Project
<br />Broward County, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If applicable)
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Sheddy provided inspection services. The project included the construction of 1,407 linear feet of 72”
<br />diameter culvert equalizer, connecting the Central Broward Water Control District's (CBWCD) N-29A Canal to the
<br />N-22 Canal. The project also includes demolition, culvert & headwall construction, and the restoration of
<br />stabilized pathway, sidewalk and asphalt roadway,
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Swale, Sidewalk, Drainage and Roadway Improvements
<br />Hallandale Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If applicable)
<br />2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Sheddy was the inspector for the ADA connections, sidewalks and drainage for the project. The plans were
<br />submitted for review at 60% and 90% completion. The sidewalk was installed to complete the existing
<br />neighborhood sidewalk network. Swales were constructed adjacent to the new sidewalks and exfiltration trench
<br />was installed to eliminate nuisance flooding.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />NE 185th Street Turn Lane Extension
<br />Aventura, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If applicable)
<br />2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Sheddy provided inspection services for the extension of the westbound left turn lane on NE 185th Street at
<br />Biscayne Boulevard. The project involved extending the left-through lane on NE 185th Street (to Biscayne Blvd.)
<br />east to the NE 27th Avenue intersection to accommodate additional traffic movements.
<br />
<br />E | Page 92
|