My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craven Thompson & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:19:08 AM
Creation date
8/21/2020 10:17:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR QUALIFICATIONS NO. 20-07-01 <br />CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br /> <br /> <br /> <br /> <br />TAB F: FIRM REFERENCES AND SIMILAR WORK COMPLETED <br /> <br />North County Neighborhood Improvement Project, Northeast Quadrant, Bid Package 11 <br />Pompano Beach, Florida <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Description of Work: <br />North County Neighborhood Improvement Project, Northeast <br />Quadrant, Bid Package 11 included over 14,777 linear feet <br />of new storm sewer, 12,993 linear feet of exfiltration trench, <br />64,000 linear feet of water main, 553 Water Services (many <br />of these services were moved from the rear of the lot to the <br />front), 49,700 linear feet of reclaimed water main, 796 <br />reclaimed water services, 43,805 linear feet of gravity <br />sewer main, 750 sewer laterals, lift station, and 1,630 <br />linear feet of force main. Main line pipe sizes ranged from <br />4” to 48” in diameter. The project also included over <br />50,688 linear feet of new roadway construction, sidewalks, <br />driveway aprons, and sodded swales. Bid Package 11 <br />included approximately 357 acres of land. Craven <br />Thompson provided surveying, civil engineering, landscape <br />architecture (design, permitting & bid assistance) and CEI <br />services on the project. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CLIENT CONTACT: <br />Mr. Patrick MacGregor <br />Expansion Project Administrator <br />Broward County Water & <br />Wastewater Services <br />2555 West Copans Road <br />Pompano Beach, Florida 33069 <br />Phone: (954) 831-0904 <br />Fax: (954) 831-0798 <br />Email: pamacgregor@broward.org <br />CTA PERSONNEL ON PROJECT: <br />Patrick Gibney, P.E. <br />Don Shaver <br />Brian Tull <br />CONTRACT TERM: <br />2011 - 2015 <br /> <br /> <br /> <br /> <br /> <br />F | Page 7
The URL can be used to link to this page
Your browser does not support the video tag.