Laserfiche WebLink
REQUEST FOR QUALIFICATIONS NO. 20-07-01 <br />CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br /> <br /> <br /> <br /> <br />TAB F: FIRM REFERENCES AND SIMILAR WORK COMPLETED <br /> <br />Miramar Historical Area Complete Streets Project - Phase II <br />Miramar, Florida <br /> <br />West Palm Beach, Florida <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Description of Work: <br />Craven Thompson was selected by the City of Miramar to <br />survey, design, permit, and provide construction services for <br />Phase II of their Historical Area Complete Streets Project. <br />The project includes surveying, landscape and engineering <br />design, permitting and construction services for complete <br />streets bounded by Pembroke Road to the north, County <br />Line Road to the south, SW 62nd Avenue to the west, and <br />State Road 7 to the east. The project includes six (6) streets <br />in the Historical Area. The improvements include: <br />sidewalks, ADA ramps, crosswalks, pedestrian level lighting, <br />landscaping and hardscape. The City received a grant <br />through the Broward Redevelopment Program for the <br />improvements. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CLIENT CONTACT: <br />Mr. Salvador Zuniga, P.E. <br />Assistant City Engineer <br />City of Miramar <br />2200 Civic Center Place <br />Miramar, Florida 33025 <br />Phone: (954) 602-3323 <br />Fax: (954) 602-3587 <br />Email: sezuniga@miramarfl.gov <br />CTA PERSONNEL ON PROJECT: <br />Patrick Gibney, P.E. <br />Douglas Taylor, P.E. <br />Luis Pimentel, P.E. <br />Don Shaver <br />PROJECT DURATION: <br />2017 - 2019 <br /> <br /> <br />F | Page 8