Laserfiche WebLink
REQUEST FOR QUALIFICATIONS NO. 20-07-01 <br />CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br /> <br /> <br /> <br /> <br />TAB F: FIRM REFERENCES AND SIMILAR WORK COMPLETED <br /> <br />Bluesten Park <br />Hallandale Beach, Florida <br /> <br />West Palm Beach, Florida <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Description of Work: <br />Bluesten Park includes a 42,000 sf Recreation Center with / <br />Pool and Splash Play Area, Soccer/Multi-Use Field, three (3) <br />baseball Fields, three (3) basketball courts, two (2) tennis <br />courts, two (2) racquetball courts, boundless ADA inclusive <br />playground, walking trails and pavilions; and full promenade <br />streetscape design for surrounding streets for pedestrian <br />friendly corridors and parallel parking. <br /> <br />Craven Thompson provided landscape architecture, <br />surveying, civil engineering, and CEI services for the project. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CLIENT CONTACT: <br />Mr. Manga Ebbe <br />Project Manager <br />City of Hallandale Beach <br />630 NW 2nd Street <br />Hallandale Beach, Florida 33009 <br />Phone: (954) 457-3043 <br />Fax: (954) 457-1624 <br />Email: mebbe@hallandalebeachfl.gov <br />CTA PERSONNEL ON PROJECT: <br />Don Shaver <br />James Sheddy <br />PROJECT DURATION: <br />2016 - 2020 <br />CRAVEN THOMPSON’S FEES: <br />$583,412.00 <br />CONSTRUCTION COST: <br />$29.4 Million <br /> <br />F | Page 26