Laserfiche WebLink
REQUEST FOR QUALIFICATIONS NO. 20-07-01 <br />CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br /> <br /> <br /> <br /> <br />TAB F: FIRM REFERENCES AND SIMILAR WORK COMPLETED <br /> <br />Gladiator Lake - Lake Bank Improvements <br />Greenacres, Florida <br /> <br />West Palm Beach, Florida <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Description of Work: <br />Craven Thompson provided surveying, design, permitting, <br />bid assistance and CEI services for the removal of 1,210 <br />linear feet of existing bulkhead, the installation of 670 linear <br />feet of new bulkhead in select areas of need, and the <br />restoration of the lake bank to typical 4:1 slope throughout. <br />Additionally, the lake bank restoration project results in a <br />net gain of approximately 1.2 ac-ft of lake storage and will <br />include replacement and repair of existing end walls and <br />pipes that have deteriorated over a long period of time. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CLIENT CONTACT: <br />Mr. Carlos I. Cedeño <br />Public Works Director <br />City of Greenacres <br />5750 Melaleuca Lane <br />Greenacres, Florida 33463 <br />Phone: (561) 642-2074 <br />Fax: (561) 642-2094 <br />Email: ccedeno@greenacresfl.gov <br /> CTA PERSONNEL ON PROJECT: <br />Don Shaver <br />James Sheddy <br />COMPLETION DATE: <br />2017 - 2019 <br />CRAVEN THOMPSON’S FEES: <br />$99,750.00 <br />CONSTRUCTION COST: <br />$1,822,588.00 <br />F | Page 27