My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craven Thompson & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:19:08 AM
Creation date
8/21/2020 10:17:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR QUALIFICATIONS NO. 20-07-01 <br />CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br /> <br /> <br /> <br /> <br />TAB F: FIRM REFERENCES AND SIMILAR WORK COMPLETED <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JAMES SHEDDY <br />SENIOR CONSTRUCTION INSPECTOR, CEI <br /> <br /> <br />Firm: <br />Craven Thompson & <br />Associates, Inc. <br />3563 NW 53rd Street <br />Fort Lauderdale, Florida 33309 <br />Education <br />Broward Community College <br />University of Florida <br />Years of Experience <br />Total: 48; With Firm: 15 <br /> <br /> <br />Mr. Sheddy is a Certified Contractor with over sixteen years supervisory <br />experience and forty-eight years overall experience in all phases of <br />construction in civil design and structural building inspection on residential <br />and commercial developments. <br />Relevant Experience: <br />Miami Gardens Livable Neighborhood Improvements - Vista Verde Phases 1A <br />& 1B | Miami Gardens, Florida | Mr. Sheddy provided construction inspection <br />for the project. Improvements are located within the City of Miami Gardens <br />bordered by NW 213th Street to the north, NW 207th Lane to the south, NW <br />37th Avenue (Douglas Road) to the east, and a vacant plot of land to the west. <br />It is a drainage improvements project for the City of Miami Gardens. The <br />project resulted in no additional increases to the site impervious area and <br />was an improvement to existing conditions. The project included 1,900 linear <br />feet of roadway and 1,900 linear feet of storm sewer and full right-of-way <br />restoration. <br />S-24 Culvert Replacement Project | Davie, Florida | Senior Construction <br />Inspector - The S-24 Replacement Project involved the replacement of the <br />existing culvert and associated headwalls with (2) 54-inch culverts and riprap <br />headwalls. Approximately 71 cubic yards of clean material was used to fill a <br />0.01-acre area and 158 cubic yards of material was dredged to a depth of - <br />3.60 NAVD from a 0.05-acre area to complete the culvert and headwall <br />installation. <br />N11 & N12 Control Structure Project | Davie, Florida | Senior Construction <br />Inspector - Provided inspection on the installation of motorized slide gates at <br />the confluence of the N-11 and N-12 Canals with the C-11 Canal. Both canals <br />are located within the District’s N-12 Basin. The project purpose is to manage <br />canal levels in the N-12 Basin to provide better flood control during routine <br />(daily) and emergency (pre- and post-storm) events. <br />NE 191st Street Drainage Improvements | Aventura, Florida | Senior <br />Construction Inspector - The stormwater improvements included the removal <br />of 425 linear feet of C.M.P. replaced with 24” R.C.P. and exfiltration trench, <br />along with 140 linear feet of new trench. <br />Harlem McBride Area Roadway & Drainage Improvements | Oakland Park, <br />Florida Senior Construction Inspector - Responsible for Inspection services for <br />drainage and roadway construction of Harlem McBride area. Project consists <br />of storm water system; water distribution system and roadway pavement <br />overlay. <br />Original Section Infrastructure Implementation | Greenacres, Florida | Senior <br />Construction Inspector Construction inspector for the remediation plan <br />implementation which involved re-shaping of the existing ditch system, <br />repairs to canal connections and embankment, and connection of incomplete <br />roadway drainage systems. <br /> F | Page 52
The URL can be used to link to this page
Your browser does not support the video tag.