My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craven Thompson & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:19:08 AM
Creation date
8/21/2020 10:17:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> STANDARD FORM 330 <br /> <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />19 <br />21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED <br />City of Miami Gardens Livable Neighborhood Improvement <br />Project – Vista Verde Phases 1D, 2, and 3 <br />Miami Gardens, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2018 2019 - 2020 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />City of Miami Gardens Mr. Tom Ruiz, CGC, CFM <br />Public Works Director <br />Phone: (786) 279-1260 <br />Email: truiz@miamigardens-fl.gov <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />The Vista Verde Phase 1D, 2, 3 Improvements project is located within the City of Miami Gardens bordered by <br />NW 213th Street to the north, NW 207th Lane to the south, NW 37th Avenue (Douglas Road) to the east, and a <br />vacant plot of land to the west. This is a drainage improvements project for the City of Miami Gardens. <br />Improvements include, but are not limited to the <br />following: <br />▪ 7,280 linear feet of storm sewer, <br />▪ 5,640 linear feet of exfiltration trench, <br />▪ 140 drainage structures, <br />▪ 30,050 SY of roadway milling & resurfacing, <br />▪ and 29,900 SY of roadway reconstruction. <br />The project involved the design, permitting of <br />Improvements for multiple phases within the Vista <br />Verde neighborhood in the City of Miami Gardens. <br />Craven Thompson processed permit applications with <br />Miami Dade Department of Environmental Resources <br />Management. Prepared bid documents. Craven <br />Thompson provided all of the survey services, all civil <br />engineering, and will provide construction management <br />for the project. <br />Construction Cost: $4,611,006.00 <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. <br />(1) FIRM NAME <br />Craven Thompson & <br />Associates, Inc. <br />(2) FIRM LOCATION (City and State) <br />3563 NW 53rd Street <br />Fort Lauderdale, Florida 33309 <br />(3) Role <br />Prime - Surveying, Stormwater Modeling, <br />Drainage Design, Permitting, and CEI Services <br />b. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) (3) Role <br />c. <br />(1) FIRM NAME <br /> <br /> <br /> <br />(2) FIRM LOCATION (City and State) (3) Role <br />d. <br />(1) FIRM NAME <br /> <br /> <br /> <br />(2) FIRM LOCATION (City and State) (3) Role <br />e. <br />(1) FIRM NAME <br /> <br /> <br /> <br />(2) FIRM LOCATION (City and State) (3) Role <br />E | Page 38
The URL can be used to link to this page
Your browser does not support the video tag.