Laserfiche WebLink
<br /> STANDARD FORM 330 <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />2 <br />21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED <br />Construction Layout for SFRTA Operations Building, <br />Parking Garage & Platform, Pompano Beach, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2016 Not Applicable <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />SFRTA Mr. Andrew Gershon, RA, LEED-AP <br />Client: Gulf Building <br />Phone: (954) 492-9191 <br />Email: andrewg@gulfbuilding.com <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Craven Thompson recovered and/or reset property boundary corners, set reference points to the boundary <br />outside the limits of construction, established survey control within the site, for the purpose of all construction <br />layout and as-builts. Prepared survey utilized throughout the project, to show building tie-in and final site survey <br />information. Established site benchmarks at convenient locations, for construction control of buildings. After <br />recovery and referencing the property corners, Craven Thompson staked the property boundaries at 50-foot <br />stations. Craven Thompson staked and graded operations, platform, and garage buildings, on double 10-foot <br />offsets to building square-out, for pad installation after site demolition. Elevations were set at proposed finish <br />floor of buildings. Staked operations, platform, and garage buildings, on double 10-foot offsets to buildings <br />square-out, for construction and <br />reference control points for future <br />replacement. Craven Thompson <br />established building grid systems for <br />both the operations, platform, and <br />garage buildings, at ground level, <br />consisting of two (2) gridlines in the <br />east-west direction, two (2) gridlines in <br />the north-south direction for both <br />buildings, all at offsets to the grid lines <br />to be determined. Reference points <br />were set outside the limits of <br />construction, along the offset grid lines, <br />for extended site lines. We then located <br />all visible improvements, trees, shrubs <br />and topography. Prepared the final <br />survey of new building, and <br />improvements connected with same. <br />Craven Thompson prepared signed and <br />sealed a final topographic survey. <br />Consultant Fees: $84,785.40 <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. <br />(1) FIRM NAME <br />Craven Thompson & Associates, Inc. <br />(2) FIRM LOCATION (City and State) <br />3563 NW 53rd Street <br />Fort Lauderdale, Florida 33309 <br />(3) Role <br />Sub-consultant - Construction Layout <br />b. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) (3) Role <br />c. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) (3) Role <br />d. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />E | Page 60