E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Robert J. Ross, PE, LEED AP
<br />13. ROLE IN THIS CONTRACT
<br /> Senior Project Manager
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />27
<br />b. WITH CURRENT FIRM
<br />17
<br />15. FIRM NAME AND LOCATION (City and State)
<br /> Ross Engineering, Inc., Miami, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />M.S. Civil Engineering, FIU, 2003 Water Resources
<br />B.S. in Civil Engineering, FIU, 2000
<br />B.S. in Engineering Technology, University of Central Florida, 1994
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Engineer – Florida PE#5485
<br />LEED Certification 2009 No. – 10445757
<br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />FDEP Qualified Stormwater Inspector #5318 HEC RAS Model Training 1996, 2000, 2004
<br />XP-SWMM Model Training 2002, 2004 ICPR Training 1997
<br />Water Environmental Federation Member American Society of Civil Engineers Member
<br />Florida Engineering Society Member / Florida Institute of Consulting Engineers Member Firm
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of North Miami – North Continuing Services Contract – AWAI Risk and
<br />Resilience Assessments and EFP Project, North Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019 - 2020
<br />CONSTRUCTION (If applicable)
<br />n/a
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Ross Engineering is performing a risk assessment and resiliency analysis for the City of North Miami’s drinking water system to certify the City’s potable
<br />water system with the Environmental Protection Agency (EPA). As part of this work, Ross has performed multiple workshops in person and virtually using
<br />Microsoft Teams with the key City staff. Coordination includes items such as vulnerability, resilience and longevity of the overall water plant and its
<br />distribution system. After the Risk and Resiliency phase completes, Ross will assist the City in creating an Emergency Response Plan (ERP) which describes
<br />strategies, resources, plans, and procedures the City can use to prepare for and respond to an incident, natural or man-made, that threatens life, property,
<br />or the environment. Incidents can range from small main breaks or localized flooding to large scale hurricanes, system contamination, among other
<br />examples. Contract Amount: $150,000; Role: Project Manager
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Florida Power & Light General Engineering Contract – Interior Roadway and
<br />Drainage Improvements, Hollywood, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If applicable)
<br />2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager and Engineer of Record for the roadway and drainage design improvements for the interior roadways where a scale and drop off area was
<br />relocated. Horizontal and vertical geometry of the roadway and new drainage improvements were located to collect and convey stormwater runoff.
<br />Additionally, driveway improvements were permitted through the City of Hollywood to allow for vehicles to have an emergency driveway exit, which is
<br />needed for the larger 18-wheel vehicles. A civil 3D model was created for the site which was used to provide plan profile and cross sections for the new
<br />roadway. Contract Amount: $75,000; Role: Project Manager
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Delray Beach – TAP and Local Initiatives Grant Assistance
<br />Delray Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br /> 2016
<br />CONSTRUCTION (If applicable)
<br />n/a
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager providing engineering and planning consulting services to assist the City Engineer’s office with a TAP grant worth $750,000 and three local
<br />initiatives worth $2.5M each with the Palm Beach County MPO and State funding. The TAP grant was for Congress Avenue from Linton Blvd to Atlantic.
<br />Brandt Bridge widening for safe pedestrian crossing and traffic calming was one of the local initiatives. Alley upgrades was the second local initiative and
<br />the 3rd and last initiative was for a green trail for pedestrians and biking along the Lake Worth Drainage District E-4 canal. Contract Amount: $25,000; Role:
<br />Project Manager
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Fort Lauderdale – Continuing Consulting Contract (As sub to Miller Legg) –
<br />Bayview Drive Drainage Improvement Project, Fort Lauderdale, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015 - 2016
<br />CONSTRUCTION (If applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Sr. Drainage Engineer for a comprehensive drainage study using ICPR for drainage improvements on and near Bayview Drive to solve existing flooding
<br />issued. Drainage improvements include an inline flap gate at the outfall, swale restoration and exfiltration trenches. Other assistance included providing a
<br />signed and sealed drainage report to be used for the Broward County EPD SWM license and assisting with comments from Broward County stormwater
<br />permit reviewers for the improvements. Contract Amount: $100,000; Role: Project Manager
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Hallandale Beach General Engineering Services Sidewalk/ADA MasterPlan
<br />Project - Hallandale Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION (If applicable)
<br />2012-2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Ross was the Project Manager for this City of Hallandale project to create a Masterplan of the City's sidewalks and connectivity. The assignment was to
<br />identify deficiencies and introduce solutions for sidewalk connectivity allowing for safe pedestrian usage including Americans with Disability Act (ADA)
<br />improvements for proper handicap access. Contract Amount: $25,000; Role: Project Manager
<br />Page 35
|