E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Melissa Ross, MSCE
<br />13. ROLE IN THIS CONTRACT
<br /> Principal in Charge
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />20
<br />b. WITH CURRENT FIRM
<br />17
<br />15. FIRM NAME AND LOCATION (City and State)
<br /> Ross Engineering, Inc., Miami, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />B.S. Civil Engineering, Florida International University, 2000
<br />Master’s in Civil Engineering, Florida International
<br />University, 2003
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Engineering Intern, Florida, License # 1100006677
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />American Society of Civil Engineers NASSCO Certified Ad-ICPR H&H Modeling Training Florida Engineering Society
<br />Haestad Methods StormCad Training Haestad Methods WaterCad Training AWWA-Risk and Resilience Certified AWWA Member
<br />Jim Moran Institute for Global Entrepreneurship Small Business Executive Program 2017
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Hallandale Beach Ingalls Park
<br />Hallandale Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017 - 2019
<br />CONSTRUCTION (If applicable)
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Ms. Ross was the Project Manager for the entire park redesign. She designed the drainage and grading for the new sidewalks, parking lot and
<br />pavilion and provided water and all the water and sewer for the bathroom and water fountains. As part of this project, the City Hallandale
<br />requested for all of the existing sidewalks surrounding the park to be extended to 8’ sidewalks. Ms. Ross obtained permits for onsite and offsite
<br />from the City of Hallandale Beach, Broward County EPD, and FDOT drainage connection permit since this site was within 500’ of an FDOT right-of-
<br />way. Const. Amount: $25,000; Role: Project Manager
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of North Miami General Engineering Services Contract – Task: Basin #5
<br />Watermain Extension, North Miami
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013 - 2014
<br />CONSTRUCTION (If applicable)
<br />2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />New Watermain extension along NE 109th Avenue. A plan and profile were provided to show any conflicts as well as a maintenance of traffic (MOT)
<br />plan. The new fire hydrants were also designed to help with fire protection. Permits were obtained with Miami-Dade County, City of Bicycle Park
<br />and Miami-Dade County Health Department. Const. Amount: $75,000; Role: Project Manager
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Fort Lauderdale Continuing Services Contract – Task Order Bayview Drive
<br />Swales/Roadway and Drainage Improvements, Fort Lauderdale, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br /> 2014 - 2017
<br />CONSTRUCTION (If applicable)
<br />Varied
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Services provided included a comprehensive drainage study using ICPR for drainage improvement on and near Bayview Drive to solve existing
<br />flooding issues. Drainage improvements included an inline flag gate at the outfall, swale restoration and exfiltration trenches. Other assistance
<br />included providing a signed and sealed drainage report to be used for Broward County EDP SWM license and assisted with comments from
<br />Broward County stormwater permit reviewers for improvements. Const Amount: $300,000; Role: Project Manager
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Broward County Library of Services - Water Management Division El Rancho Canal
<br />Project, Broward County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br /> 2012
<br />CONSTRUCTION (If applicable)
<br />2012 - 2013
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Ms. Ross was the Project Manager for the design of a culvert control structure in the canal that starts with a riser box at the existing headwall and
<br />extend 150 feet east of the canal. This project also included four utility crossings shown on a profile, specifications, price quotes and construction
<br />observations. Contract Amount: $25,000; Role: Civil Engineer/Project Manager
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miami Dade County Water and Sewer Department NW 22nd Ave Wastewater
<br />Collection/Transmission System Expansion and Water Distribution Systems
<br />Improvement for the North Sub-Basin (D2-C-1), Miami-Dade County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019 - 2023
<br />CONSTRUCTION (If applicable)
<br /> 2021- 2023
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Ross Engineering recently won the Small Diameter Pipe Design Contract from Miami Dade Water and Sewer Department (MDWASD) for $4.4M
<br />over the next 6 years. Our third task work order from MDWASD included a complete design of the water and wastewater in unincorporated Miami
<br />Dade County. This design included 11,500 linear feet of new 8” and 12” sewer main, 850 linear feet of force main, and 5,800 linear feet of 8”, 10”
<br />and 12” watermain along NW 22nd Ave. All the residents in that area will be required to abandon their existing septic systems and connect to the
<br />new sewer lateral that will be designed for each house. Through this new project, each property will be provided a new 6” sanitary sewer lateral,
<br />new water meter and water service that is connected to the new mains in the street. Monthly meetings were held to coordinate with the Project
<br />Manager. Permits will be obtained through Miami Dade County DERM, Health Department and Miami County Public works. Ross Inspectors will be
<br />onsite during construction to ensure that everything is installed as per approved permitted plans. Const. Cost: $10M; Role: Project Engineer
<br />Page 36
|